Laserfiche WebLink
t • <br />aterly compost inspection conducted on this date and the following was noted: <br />1. Previous area of concern regarding the acceptance of OSB and particle board has been corrected. <br />Documents were submitted to the EHD and it was determined that the facitlity may continue to accept <br />OSB and particle board so long as this material is mixed with the greenwaste. The amount of OSB <br />and particle board mixed with the greenwaste must be no more than 5%. Monitor and ensure that <br />the OSB and particle board is evenly dispersed throughout the pile and not concentrated in one <br />windrow or part of a windrow. <br />The treated wood waste (TWW) has not been removed since the previous inspection (12/15/11). <br />3. The total amount of material on site was approximately 3,527 cubic yards. <br />Lab results for the metal concentrations, fecal coliform levels, and Salmonella levels of the compost <br />product show that the compost product has met the state standards. <br />5. The temperature range of the greenwaste piles and ground material was 75 F to 144 F and 151 F to <br />152 F respectively. The temperature range of the windrows and overs was 93 F to 148 F and 65 F to <br />119 F respectively. The temperature of the pre-screened product and the screened product was 107 <br />F and 83 F respectively. <br />