Laserfiche WebLink
OPW 7150 Overfill MaterialsImportant <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB- certified OPW 71 SO Float: Nitrile rubber, closed cell foam storage rank (UST), properly <br /> vapor-tight Overfill Prevention Valve maintained delivery equipment <br /> Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals : Viton° Delivery personnel should <br /> a positive shut- off of product delivery. Upper & lower Drop Tube : Aluminum be managed and trained <br /> to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling , Hardware : Stainless steel missing pans, They should <br /> The OPW 71 SO allows easy Installation always make certain there <br /> < is a positive connection <br /> (without breaking concrete) and requires Features 1417V f between the adaptor and <br /> no special manholes, ® Simple, Easy and Quick elbow. If delivery equipment <br /> is not properly maintained, <br /> The OPW 7150 is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid special manholes required , coupled to the adaptor, a <br /> level rises to about 95 % of tank serious spill may result when <br /> capacity, the valve mechanism is ^ Economical — costs a fraction the DPW 7150 closes, causing <br /> i <br /> f <br /> oexpensive, complicated and <br /> released, closing automatically with lid a hazard and environmental� <br /> the flow. This reduces the flow rate to difficult-to- install valves, contamination , <br /> approximately 5 gpm through a bypass Furnished Complete — supplied NOTE : The DPW 7150 is <br /> valve. The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> fillip process and disconnect and drain mounting hardware and thorough gravity drop applications only. <br /> 9 P 9 g Do not use for pressure <br /> the delivery hose, As long as the liquid instructions for quick job site time, fill applications. <br /> exceeds the 95 % level, the valve will <% Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform , no resets and no overrides to be broken <br /> Is attempted , Retrofits Directly — for both new If the delivery is not stopped and the or abused . and existing tanks with 4 " fill risers , <br /> liquid rises to about 98 % of tank No Pressurization of the Tank — e> Quick Drain Feature — <br /> capacity, the bypass valve closes automatically drains hose when head <br /> operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow P <br /> into the tank until the level drops below will Accept a Dipstick <br /> a reset point. for Gauging <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems : <br /> Authority Having Jurisdiction (AHJ ) and Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk . <br /> determine the regulatory requirements <br /> governing shut-off capacity in your alertness or speed of response of the ,.. <br /> delivery attendant for certainty of Speeds Delivery Operations <br /> region, as well as take Into account overfill prevention — product flows unimpeded into <br /> , <br /> other considerations such as extreme the tank until the hose " kick " that <br /> tank tilt. In all cases, the upper tube ^ Keeps the Top of UST " Dry, " accompanies the valve shut- off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 61 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. installation — in both two-point <br /> EPA requirements, e> Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 7150 Instruction Sheet Order <br /> Number: H15524PA vent piping are required , <br /> look for this label for <br /> Listings and U `C 1tl authentic OPW EVR <br /> Certificationse'11ror"Air Approved products. <br /> Resources Board c— OPW 7150 is EVR Approved for E85 <br /> 104 4=0PVV* <br />