My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:47:48 PM
Creation date
2/25/2021 4:42:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Farm <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Gapacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> PasslFail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fall ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer Z Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: gauge <br /> Pipe Ryan ID reg 1 reg 2 plus 1 plus 2 <br /> Pipe Manufacturer environ environ environ environ <br /> Test Start Time 11:58 11:58 10:23 10:23 <br /> Initial Reading 5psi 5psi 5psi 5psi <br /> Test End Time 12:58 12:58 11:23 11:23 <br /> Final Reading 5psi 5psi 5psi 5psi <br /> Change in Reading 0 0 0 0 <br /> PassfFail Criteria 0 0 0 0 <br /> Tightness Test Results ® Pass 0 Fail 0 Pass ❑ Fail J Pass ❑ Fail 17 Pass ❑ Fail <br /> Pipe Run ID sup 1 sup 2 <br /> Pipe Manufacturer environ environ <br /> Test Start Time 10:23 10:23 <br /> Initial Reading 5psi 5psi <br /> Test End Time 11:23 11:23 <br /> Final Reading 5psi 5psi <br /> Change in Reading 0 0 <br /> PassfFail Criteria 0 0 <br /> Tightness Test Results ❑ Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked"Fall'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.