My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
13773
>
2600 - Land Use Program
>
PA-1800315
>
SU0013917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:18:23 PM
Creation date
3/4/2021 8:02:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013917
PE
2631
FACILITY_NAME
PA-1800315
STREET_NUMBER
13773
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
20312011
ENTERED_DATE
2/10/2021 12:00:00 AM
SITE_LOCATION
13773 S MURPHY RD
RECEIVED_DATE
4/8/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 6 <br /> Cost to Retrofit Existing Dairies That Do Not Have Tier 1 Or Tier 2 Lagoons <br /> great, the cost for installing monitoring wells increases and other groundwater quality influences <br /> can possibly be mixed in the samples taken, obscuring the conclusions that can be drawn. <br /> In Table 1 above the single liner option includes costs for installing lagoons, but does not <br /> include costs for monitoring. These can include the installation of monitoring wells, sampling <br /> and laboratory analysis on an ongoing basis, data assessment and analysis, and technical <br /> reports. These costs are not insignificant and can cost tens of thousands of dollars for well <br /> installation and hundreds to thousands of dollars per year in ongoing costs. <br /> New Location vs. Existing Location <br /> To rebuild a lagoon in the current location, provisions must be made to divert and contain the <br /> daily barn water generation (and any rainfall runoff) temporarily during the construction period. <br /> In many cases this may not be feasible, leading to the only other option, to build in a new <br /> location. <br /> To compact the soil for structural support and installation of the HDPE liner, the side slopes <br /> must typically be 2:1 (horizontal: vertical) or flatter, depending on soil properties. Typical <br /> existing lagoon slopes are 1.5:1 or steeper. Therefore a larger lagoon footprint is likely to be <br /> needed to maintain the storage volume. In addition, the retrofit will need to provide 5 to 6 feet of <br /> additional room around the lagoon perimeter for an anchor trench to hold the liner material. <br /> Many lagoons are positioned near other structures on the dairy and this additional space may <br /> not be available. <br /> Relocating the lagoon to a new area may require county permit changes if the location is <br /> outside of the established footprint of the dairy. Such changes are likely to trigger the need to <br /> comply with the California Environment Quality Act (CEQA), which could require the preparation <br /> of a mitigated negative declaration or an Environmental Impact Report (EIR). Other land use <br /> permits may also be triggered. Additional costs to comply with local land use permitting <br /> processes (including CEQA compliance) could possibly ranging between $30,000 to $100,000 <br /> or more. <br /> The estimates in Table 1 indicate approximately how many acres the new lagoon is expected to <br /> occupy. In some cases, locating the new lagoon near the existing lagoon is infeasible and <br /> additional costs may be incurred to route the wastewater to a more distant location. In some <br /> cases, significant infrastructure, such as a pump station, may be required. <br /> Highest Anticipated Groundwater <br /> In shallow groundwater areas, this can be a significant issue complicating lagoon design. In <br /> other areas where the groundwater has deepened, but historically has been within 5 feet of the <br /> invert, it can present a physical or regulatory risk. <br /> In order to quantify the highest anticipated groundwater to plan lagoon construction, areas with <br /> shallow groundwater require study on factors influencing the groundwater level, including <br /> influences from irrigations, ditches, or rainfall. This could require a complete year of study, <br /> periodically recording depth to groundwater in the intended site area, followed by a report from a <br /> geologist documenting the findings and recommendations. Conclusions may dictate reducing <br /> lagoon depth, building an above ground lagoon, and/or artificially controlling the water table with <br /> a tile drainage system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.