My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2021 10:52:37 AM
Creation date
3/5/2021 2:07:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMPIUDC TEST (continued) <br /> Test Method Developed by Manufacturerv/ Industry Standard Professional Engineer <br /> Test Type Pressure vacuum ZHydrostatic <br /> Test Equipment Used:Incon TS-STS <br /> Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 UDC 7/8 <br /> Sump Manufacturer Unknown unknown Unknown unknown <br /> Sump Depth (inches) 35" 35" 35" 35" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 20" 20" 20" 20" <br /> (inches) <br /> Test Start Time 1:54pm 1:54pm 1:54pm 1:54pm <br /> Initial Reading 1.3493" 2.9616" 2.2402" 3.2718" <br /> Test End Time 2:09pm 2:09pm 2:09pm 2:09pm <br /> Final Reading 1.3494" 2.9619" 2.2395" 3.2717" <br /> Change in Reading 0.0001" 0.0003" 0.0007" 0.0001■ <br /> Pass/Fail Criteria 0.002 0.002" 0.002" 0.002" <br /> Tightness Test Results �/ Pass Fail IZPassLjFail ZPass Fail �/ assLJFail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> ass ail Criteria <br /> Tightness Test Results Pass Fail Pass Fail ass Fail Pass Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.