My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 3:43:35 PM
Creation date
3/5/2021 2:12:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body (see figures), upper tube length . <br /> Note: the Upper Tube Length must be at least 16" to in- <br /> clude the protective bend in the tube. <br /> ( D) _ <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length . (D) <br /> (W) = Upper <br /> (U) = Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61 TP models add 0.6'7 TLength, <br /> (B) =From the tank calibration chart provided by tank manu-facturer find the dipstick number (Y) which corresponds <br /> to the 100% volume . (B) <br /> (Y) = To Tank <br /> Y) <br /> 1 . To determine shut-off percentage: Tank <br /> Subtract upper tube length (D) from distance to tank ( U) Valve Chart <br /> bottom (B) Length, 100% <br /> (X) _ (B) _ (D) _ �� = top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. <br /> (X) tank capacity in gallons = <br /> (Y) tank capacity in gallons = <br /> SO% _ (X) capacity / (Y) capacity x100 <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local, state, and national codes . if <br /> the overfill valve is set above the allowable shut off percent- <br /> age the overfill valve must be removed and replaced . For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.