My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013963
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
22640
>
2600 - Land Use Program
>
PA-2000214
>
SU0013963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:06:04 AM
Creation date
3/19/2021 1:44:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013963
PE
2632
FACILITY_NAME
PA-2000214
STREET_NUMBER
22640
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95336-
APN
24519045
ENTERED_DATE
3/2/2021 12:00:00 AM
SITE_LOCATION
22640 S MURPHY RD
RECEIVED_DATE
9/8/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> PA-2000214 (SA) <br /> 3) The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution R-00-433) <br /> 4) The Regional Transportation Impact Fee shall be required for this application. The fee is <br /> due and payable at the time of building permit application. The fee will be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> 5) The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards. Retention basins shall be fenced with six (6) foot high chain link <br /> fence or equal when the maximum design depth is 18 inches or more. Required retention <br /> basin capacity shall be calculated and submitted along with a drainage plan for review and <br /> approval, prior to release of building permit. (Development Title Section 9-1135) <br /> CH:DS <br />
The URL can be used to link to this page
Your browser does not support the video tag.