Laserfiche WebLink
Soil Suitability / Nitrate Loading Study <br />Cherokee Memorial Park Vineyard Chapel Addition Ŷ Lodi, California <br />March 5, 2021 Ŷ Terracon Project No. NA207102 <br />Responsive Ŷ Resourceful Ŷ Reliable 9 <br />Table 5. <br />Summary of Adjoining Property Septic Permits. <br />Direction Address Permit # <br />(Year)Type Tank Size <br />(Gallons) <br />Leach <br />Line <br />Quantity <br />Leach <br />Line <br />Length <br />(Feet) <br />Filter Bed <br />Width, Length, <br />Depth (Feet) <br />North 14273 N. Beckman Rd. NF --- --- --- --- --- <br />East 14370 N. Beckman Rd. NF --- --- --- --- --- <br />East 14150 N. Beckman Rd. NF --- --- --- --- --- <br />East 14000 N. Beckman Rd. NF --- --- --- --- --- <br />East 13840 N. Beckman Rd. <br />SR0079326 <br />(2018)Destruction --- --- --- --- <br />East 13642 N. Beckman Rd. <br />70-609 Install 1200 4 80 --- <br />SR0060864 <br />(2010)Repair --- --- --- 10 x 27-32 x 3 <br />East 13638 N. Beckman Rd. <br />72-1144 <br />(1972)Install 1200 3 53 --- <br />SR0030354 <br />(2002)Repair --- 1 40 --- <br />East 13634 N. Beckman Rd. <br />71-266 <br />(1971)Install 1200 4 80 --- <br />SR0005114 <br />(1995)Repair --- --- --- 2 x 30 x 8 sump <br />East 4825 E. Harney Ln. NF --- --- --- --- --- <br />South 5166 E. Harney Ln <br />SR0082401 <br />(2020) <br />Tank <br />Destruction --- --- --- --- <br />76-623 <br />(1976 Repair --- 1 50 <br />48 x 25 seepage <br />pit <br />73-947 <br />(1973)Repair --- 1 100 --- <br />NF – No septic permits found, LL – leach lines <br />Based on a review of the permits, the septic systems in the area appear to utilize 40 to 100-foot <br />long leach lines and/or filter beds, sumps, or seepage pits. <br />1.3.6 Septic Repair Permit History in the Vicinity <br />Septic repairs in the vicinity appear to be for the addition of leach lines, seepage pits, sumps, or <br />filter beds. Copies of selected septic permits can be found in Appendix C of this report. <br />1.3.7 Expected On-Site Maximum Septic Tank Usage <br />Proposed Vineyard Chapel Addition - According to Mr. Scheffer the proposed Vineyard Chapel <br />addition will be occupied seven days per week year round from 8 am to 8 pm. During business <br />hours Monday through Friday from 8am to 5pm, the addition will be staffed with up to 25 <br />employees and up to approximately 100 visitors per day. From 5 to 8 PM, approximately 2