My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2021 12:53:51 PM
Creation date
3/23/2021 10:34:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MIRACLE MILE MARKET as of March 09 , 2021 . <br /> Open violations from August 25 , 2020 inspection <br /> Violation # 122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION : An inspection was last done on 08/20/2019 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> 09/ 19/2019 . This information has not been received resulting in a non -compliant status for this facility . <br /> REGULATION GUIDANCE : An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION : Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was correctedThis violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken for correct violation : � f' f� )ej `1R k"II A L <br /> IS^ <br /> Violation #207 - DO monthly reports not maintained on site for 12 months or for 36 months (after October 1 , <br /> 2018) . <br /> OBSERVATION : The 07/29/2020 designated operator inspection report was not found on site. Alarm history was <br /> printed and available on site , however, there the designated operator monthly inspection report was not found on <br /> site . <br /> REGULATION GUIDANCE : Designated operator inspection reports prior to October 1 , 2018 shall be retained on <br /> site for twelve months . Designated operator inspection reports on or after October 1 , 2018 shall be retained on site <br /> for thirty-six months . <br /> CORRECTIVE ACTION : Locate and ensure that copies of the previous thirty-six months of designated operator <br /> inspection reports are maintained on site. Submit copies of the missing reports to the EHD . <br /> ❑ This violation was corrected E This violation will be corrected by (date) : 6 <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : �� j^ e. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.