Laserfiche WebLink
S A N J 0 A Q I I I Irl Environmental Health Department <br /> CCUN r <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> Marks Fuel& Food, Inc. T880 E VICTOR RD, LODI September 28, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 109 CCR 2715(a)(1)(B), 2715(a)(3) Failure to submit"Designated Underground Storage Tank Operator Identification <br /> Form"within 30 days. <br /> OBSERVATION:A new designated operator,Amy Winkler, began conducting inspections on 04/30/2021 and <br /> notification was not provided to the EHD within 30 days of the change. <br /> REGULATION GUIDANCE: The owner or operator shall submit a"Designated Underground Storage Tank Operator <br /> Identification Form"no later than 30 days after any change in the designated UST operator(s). <br /> CORRECTIVE ACTION: This violation was corrected on site. The updated designated operator identification form <br /> was uploaded into CERS during the inspection. <br /> This is a repeat violation, Class ll. <br /> 122 CCR 2712(f)Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION:A paperwork inspection was last done on 11/17/2020 and an inspection report was issued <br /> identifying information to be submitted to bring this site into compliance. This information was required to be <br /> submitted by 12/19/2020. This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation, Class ll. <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The owner/operator failed to document a corrective action for the compliance issues documented <br /> by the designated operator on the 12/02/2020 monthly inspection report. <br /> REGULATORY GUIDANCE:Within 48 hours of the completion of the designated UST operator visual inspection, <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report,the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues. <br /> CORRECTIVE ACTION: Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future. <br /> This is a repeat violation, Class ll. <br /> FA0003862 PR0231746 SCO01 09/28/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />