My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 3:31:12 PM
Creation date
3/26/2021 3:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i-----Circuit Board Types - ECPUI/ECPU2 - Battery Replacement <br /> .® Veeder-Root recommends conducting the following procedure prior to any Annual Certification or Operability test. <br /> This procedure will help assist in identifying the operational status of the backup battery before removing power to <br /> the ATG system. During this procedure the TLS power should remain on at all times unless specified. <br /> 1. Print out the System Setup. <br /> 2. Perform the "Archiving the System Setup" on page 4. <br /> 3. Again print out System Setup and verify that the Archived Setup matches the setup printed in Step 1. <br /> 4. For easier access to the ECPU and Battery,you may want to remove the printer door group. <br /> 5. Carefully remove printer ribbon cable between the printer and ECPU. Do NOT shut the Battery Switch off <br /> (Down Position). <br /> 6. Using a Volt Meter,verify battery voltage for the applicable console by putting the positive lead on Resistor <br /> 151 shown in Figure 10) and the negative lead on any exposed metal of the console's chassis.Use the battery <br /> test pads for voltage measurement, if available. <br /> NOTE:TLS-350/35OR ECPU boards manufactured after January 19th 2011 have Battery Test points located <br /> below the dip switch area.The figure below shows the location of both the battery test pads and R151. <br /> R 151 7-310 r ©Ili�i�l <br /> z Battery test pads <br /> I ` <br /> E <br /> _ s <br /> Figure 10. Battery voltage test locations on ECPU board <br /> 7. Does the volt meter read 3.4 to 3.6 Vdc? If Yes, Do not remove Battery. Battery is not defective do not remove <br /> it, go to Step 14. If No,go to Step 8. <br /> 8. Using an insulated screw driver, push down and pull away on the battery cover that is attached to the ECPU <br /> board. You may want to use your finger tips to help remove the battery cover. Please be careful you don't <br /> touch any other circuits on the board (see Figure 11, A). After the top of the battery cover has dislodged,you <br /> can pull the cover off with you finger tips(see Figure 11, B). <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.