Laserfiche WebLink
Site Work/Earth Work <br /> Q: Blower Flare Facility access road tie-in with existing road is not clear on plans. What is <br /> the tie-in location? <br /> A: Blower Flare Facility access road ties into existing roadway at approximately Northing <br /> 8275,Easting 9630. <br /> Q: Technical Specifications, Section 02221,Part 2.01.C. The materials listed under <br /> "Select Backji'll" are not available with the stated minimum plasticity index. <br /> A: "Select Backjill" shall consist of the listed classifications of materials, with a maximum <br /> plasticity index of 4, and be free of organic materials. <br /> Q: Technical Specifications, Section 02221,Part 2.01.D. The materials listed under <br /> "Engineered Fill" are not available with the stated minimum plasticity index. <br /> A: "Engineered Fill" shall consist of the listed classifications of materials, with a maximum <br /> plasticity index of 4, and be free of organic mate <br /> Q: Technical Specifications, Section 02221,Part 2.01.E. The gradation listed under <br /> "Coarse Gravel"is not available with zero percent passing '/2-inch sieve. <br /> A: The range of percent passing '/cinch sieve shall be less than five percent. <br /> Q: Technical Specifications, Section 02221,Part 2.01.G. The gradation listed under <br /> "Sand Bedding"is incorrect. <br /> A: The correct gradation is as follows: <br /> U.S. Sieve Size Ranize of Percent Passin <br /> No. 4 95 to 100 <br /> No. 16 60 to 95 <br /> No. 50 0 to 50 <br /> No. 100 0 to 20 <br /> No. 200 0 to 5 <br /> Q: Technical Specifications,Section 02687, part 3.03.B. Does other earthmoving <br /> equipment, in addition to the drill rig, have to be track-mounted? <br /> A: The Contractor may use other low foot-pressure equipment,with the approval of the <br /> OWNER/ENGINEER. The intent is to minimize disturbances of the soil cover surface that <br /> are required to be restored by Contractor. <br /> Technical Specifications, Section 02221. Does ground surface preparation <br /> pt n tion (Sectiofaces along <br /> Q. 02221,Part 3.03.F)include removing vegetation and breaks g p g <br /> proposed pipe alignments? <br />