My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1997 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_1997 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 12:33:25 PM
Creation date
3/29/2021 9:53:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1997 - 2000
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A: To minim e existing soil cap, the soil surface along the proposed pipe <br /> vegetation. Ground surface preparation for pipe <br /> alignments will not be cleared of existing e contact surface to a depth of two to <br /> trenching and backfill will consist of scarifying the <br /> three inches using a method approved by OWNSR/ENGrINE <br /> Q: <br /> and 5 <br /> Drawings 4 9 details 4, 6, and 5. What material is to be used at tIhertleo�tions called <br /> out as"General Backfill", for filling and mounding the shallow pipe tre <br /> A: Material for"General Backfill" shall be Vegetative Cover, as described in Technical <br /> Specifications Section 02221 Part 2.01.B. <br /> Landscaping <br /> Q• <br /> Drawing L-1. How many boulders are required for landscaping at each well head? <br /> A: <br /> Assume five boulders per well head, three-foot boulders (two each), and two-foot boulders <br /> (three each). <br /> Technical S ecifications, Section 02221. Does restoration of surface conditions include <br /> Q: P <br /> hydroseeding all disturbed areas? <br /> hall be <br /> A. Yes. All areas of exposed soil surface and all areas of <br /> the O INEew soil cWENGement sINEER. The seed <br /> revegetated by a hydroseed process to be approved y <br /> schedule to revegetate disturbed areas shall consist of- <br /> 3 5%Trifolium Hirtem (Hykon Rose Clover) <br /> 35%Elymus Glacus (Blue Wildrye) <br /> 30%Bromus Carinatus(California Brome) <br /> The application rates for revegetating disturbed areas shall consist of: <br /> Seed Rate: 40 pounds/acre <br /> Hydroseed Mulch(Cellulose Fiber): 500 poundslacre <br /> Stabilizing Emulsion (Solids): 90 pounds/acre <br /> Fertilizer 16-20-0: 250 pounds/acre <br /> Flare Equipment <br /> Technical S ecifications, Section 11000,Part 2.01. Should the blower heads and <br /> Q: Tec p <br /> sections be internally coated? <br /> A: Yes,blower manufacturer's standard coating(i.e.,Bisonite,Heresite) should be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.