Laserfiche WebLink
A: To minim e existing soil cap, the soil surface along the proposed pipe <br /> vegetation. Ground surface preparation for pipe <br /> alignments will not be cleared of existing e contact surface to a depth of two to <br /> trenching and backfill will consist of scarifying the <br /> three inches using a method approved by OWNSR/ENGrINE <br /> Q: <br /> and 5 <br /> Drawings 4 9 details 4, 6, and 5. What material is to be used at tIhertleo�tions called <br /> out as"General Backfill", for filling and mounding the shallow pipe tre <br /> A: Material for"General Backfill" shall be Vegetative Cover, as described in Technical <br /> Specifications Section 02221 Part 2.01.B. <br /> Landscaping <br /> Q• <br /> Drawing L-1. How many boulders are required for landscaping at each well head? <br /> A: <br /> Assume five boulders per well head, three-foot boulders (two each), and two-foot boulders <br /> (three each). <br /> Technical S ecifications, Section 02221. Does restoration of surface conditions include <br /> Q: P <br /> hydroseeding all disturbed areas? <br /> hall be <br /> A. Yes. All areas of exposed soil surface and all areas of <br /> the O INEew soil cWENGement sINEER. The seed <br /> revegetated by a hydroseed process to be approved y <br /> schedule to revegetate disturbed areas shall consist of- <br /> 3 5%Trifolium Hirtem (Hykon Rose Clover) <br /> 35%Elymus Glacus (Blue Wildrye) <br /> 30%Bromus Carinatus(California Brome) <br /> The application rates for revegetating disturbed areas shall consist of: <br /> Seed Rate: 40 pounds/acre <br /> Hydroseed Mulch(Cellulose Fiber): 500 poundslacre <br /> Stabilizing Emulsion (Solids): 90 pounds/acre <br /> Fertilizer 16-20-0: 250 pounds/acre <br /> Flare Equipment <br /> Technical S ecifications, Section 11000,Part 2.01. Should the blower heads and <br /> Q: Tec p <br /> sections be internally coated? <br /> A: Yes,blower manufacturer's standard coating(i.e.,Bisonite,Heresite) should be provided. <br />