Laserfiche WebLink
Hazards:Struck-by,run-over, • Equipment inspected daily and documented on Forklift Preoperational Inspection Checklist, <br /> overhead hazards,caught between Do not exceed lifting load limits. <br /> (pinch points),roll over,fluid leaks. . Forklift shall not be moved/driven with empty forks in raised position. <br /> • When not in use,forks lowered,brake set,controls in neutral,key removed. <br /> Geosyntec Procedure(s):HS-505-Safe Operation of Forklifts,HS-132-Competent Persons <br /> AERIAL LIFTS ❑See Section 6.4.,"Fall Hazards" <br /> Geosyntec Procedure(s):HS-509-Aerial Lifts <br /> TRENCHING/EXCAVATION ❑Safe work practices when personnel will enter trenches/excavations: <br /> Hazards:Cave-in,hazardous • Activities under supervision/oversight of competent person,daily inspection. <br /> atmosphere,structures& • Excavated materials placed at least 2'from trench sidewall. <br /> foundations,falls into excavations . Prevent water accumulation in trench. <br /> • Sloping&shoring for excavations>_20'must be approved by a professional engineer. <br /> • Sloping/shoring/trench box for excavations>_5'when persons enter trench/excavation. <br /> • Sloping/shoring/trench box for shallow(<5')excavations with cave-in hazard. <br /> • Workers in trenches to be within 25 feet of ladder or sloped entryway. <br /> • Excavations to be protected by perimeter fencing(not barricade tape),if potential for personnel to fall into. <br /> • If potential for atmospheric hazard,see Section B.10,"Confined Space Entry,Hazardous Enclosed Spaces" <br /> Geosyntec Procedure(s):HS-402-Excavation and Trenching,HS-132-Competent Persons <br /> IMPORTANTI This work may/will ❑Follow safe work practices per Section B.9.,"Utility Related Hazards" <br /> include close proximity to overhead <br /> and/or underground utility lines. <br /> DEMOLITION ❑Develop/implement demolition safety plan. <br /> Geosyntec Procedure(s): HS-132-Competent Persons <br /> ❑ BLASTING ❑Develop/implement blasting safety plan. <br /> Geosyntec Procedure(s):HS-307-Blasting and Use of Explosives,HS-132-Competent Persons <br /> PUBLIC AT RISK,SITE SECURITY ❑During site operations protect public(overhead protection,barriers,warning signs). <br /> ❑During off hours,protect public with barriers,warning signs/lights,other measures as appropriate. <br /> ❑Lock/secure hazardous materials and/or equipment. <br /> 13.8.ELECTRICAL HAZARDS ❑Applicable ® Not Applicable,Not Anticipated <br /> EXPLANATORY NOTES,CLARIFICATIONS: <br /> BASIC ELECTRICAL HAZARDS TO ❑Follow safe work practices: <br /> SKILLED NON ELECTRICAL WORKERS . Control water-related/wet-location hazards in a manner appropriate for the job tasks/equipment/tool. <br /> Equipment/tool use/operation,use • Never touch electrical equipment if you are wet,or standing in water or on wet surfaces. <br /> of extension cords,working near • Use extension cords/power cords properly,prevent damage,take out of service if damaged. <br /> electrical equipment. Inspect tool/equipment/extension cords/power cords/welding cables before each use;do not use if damaged. <br /> • Use GFCI-protected outlet or portable GFCI in wet locations,outdoors,basements,concrete floors. <br /> Hazards:Electrical shock,secondary • Ensure live parts are guarded,enclosures secure. <br /> hazards(falls,other injuries). • Enclosures,circuits properly labeled. <br /> Geosyntec Procedure(s):HS-121-Electrical Safety <br /> HANDS-ON ELECTRICAL WORK BY ❑Implement electrical safe work practices pertaining to: <br /> ELECTRICAL WORKER/TECHNICIAN: . Worker training/qualification(Level 1,Level 2,Level 3) <br /> ❑Voltage<50 v • General electrical safe work practices,grounding,use of GFCIs <br /> ❑Voltage 50-600v • Safe work practices during diagnostics/troubleshooting,maintenance,repair <br /> ❑Voltage>600v • Safe design features for electrical equipment <br /> ❑AC ❑DC ❑3-phase • Arc flash protection <br /> ❑Battery and/or solar power <br /> ❑Capacitor/transformer Geosyntec Procedure(s):HS-121-Electrical Safety,HS-129-High Voltage Electricity Safety <br /> LOCKOUT/TAGOUT OF ELECTRICAL ❑Implement control-of-hazardous-energy practices(lockout/tagout),provide lockout/tagout locks and <br /> ENERGY devices,training workers,designate"authorized"personnel,notify"affected"personnel. <br /> Geosyntec Procedure(s):HS-119-Lockout Tagout,HS-121-Electrical Safety <br /> IMPORTANT! This work may/will ❑Follow safe work practices per Section B.9.,"Utility Related Hazards" <br /> include close proximity to electric <br /> utility lines. <br /> 8.9. UTILITY RELATED HAZARDS ❑Applicable ® Not Applicable,Not Anticipated <br /> EXPLANATORY NOTES,CLARIFICATIONS: <br /> OVERHEAD,ABOVE-GROUND ❑Maintain proper clearance,employ other appropriate precautions for the conditions. <br /> UTILITIES Geosyntec Procedure(s):HS-304-Overhead Electrical Lines <br /> t THA(ver.2)—Task 1 -Driving October 22,2020 <br /> Geosyntec Lincoln Center-SAC1111 Page 7 <br /> ccinstiltnnts <br />