My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
255
>
2300 - Underground Storage Tank Program
>
PR0537549
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2021 7:59:50 AM
Creation date
4/5/2021 1:54:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0537549
PE
2351
FACILITY_ID
FA0021617
FACILITY_NAME
HARNEY LANE AM PM
STREET_NUMBER
255
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
062-580-40
CURRENT_STATUS
01
SITE_LOCATION
255 E Harney Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N J 0 A Q I I I Irl Environmental Health Department <br /> COUNT <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> HARNEY LANE AM PM 255 E Harney Ln, Lodi June 21, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 319 CCR 2635, 2637.2,2665, 2712 Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION: Per the ICC service technician Rhome Desbiens,the 87, 91, and diesel overfill prevention system <br /> failed. <br /> REGULATION GUIDANCE:All UST systems must be equipped with an approved,functional overfill prevention <br /> device at all times during delivery operations. <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is <br /> repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection of the EHD. <br /> If the failed component can't be replaced immediately,there is a possibility that the 87, 91, and diesel UST systems <br /> may be red tagged to prevent fuel inputs. <br /> This is a Class II violation. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by July 21, 2021. <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> of having them sign. Starting September 1, 2018, all in-office CERS help will be provided at EHD hourly rate <br /> ($152). To schedule an appointment, please call (209)468-3420. <br /> Documents provided during inspection: inspection report, return to compliance certification, corrective action <br /> statement and list of free CUPA classes. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: June 21, 2021 Inspector: Inspector Phone: <br /> Printed Name and Title: VICKY VANG-LEE, EH Specialist (209)616-3028 <br /> Emailed to Arminder Lada, Environmental Contact <br /> FA0021617 PR0537549 SCO01 06/21/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 7 of 7 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.