Laserfiche WebLink
TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance Significance <br /> Before Mitigation After Mitigation <br /> Potential Impact Measures Mitigation Measures Measures <br /> installation of these facilities. The County shall determine <br /> fair-share costs. <br /> d) Emergency Access LS None required. - <br /> 3.18 TRIBAL CULTURAL RESOURCES W - <br /> a-i,ii)Tribal Cultural Resources PS Mitigation Measures CULT-1 and CULT-2. LS <br /> 3.19 UTILITIES AND SERVICE SYSTEMS - <br /> a)Construction or Relocation of Infrastructure LS None required. - <br /> b)Water Supply LS None required. - <br /> c)Wastewater Systems LS None required. - <br /> d,e) Solid Waste Services LS None required. - <br /> 3.20 WILDFIRE I <br /> a)Emergency Response and Emergency Evacuation NI None required. - <br /> Plans <br /> b) Exposure of Project Occupants to Pollutants NI None required. - <br /> c)Installation and Maintenance of Infrastructure NI None required. - <br /> d) Risks from Runoff,Post-Fire Slope Instability,or NI None required. - <br /> Drainage Changes <br /> 3.21 MANDATORY FINDINGS OF SIGNIFICANCE <br /> Pock Lane Public Review Draft IS/MND 1-19 May 2022 <br /> LEGEND: NI = No Impact; LS=Less Than Significant; PS=Potentially Significant <br />