Laserfiche WebLink
TABLE 1-1 <br /> SUMMARY OF ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES <br /> Significance Significance <br /> Before Mitigation After Mitigation <br /> Potential Impact Measures Mitigation Measures Measures <br /> 3.15 PUBLIC SERVICES <br /> a-i) Fire Protection LS None required. - <br /> a-ii)Police Protection LS None required. - <br /> a-iii) Schools LS None required. - <br /> a-iv) Parks LS None required. - <br /> a-v)Other Public Facilities LS None required. - <br /> 3.16 RECREATION <br /> a,b) Recreational Facilities LS None required. - <br /> 3.17 TRANSPORTATION <br /> a) Conflict with Transportation Plans, Ordinances LS None required. <br /> and Policies <br /> b) Conflict with CEQA Guidelines Section LS None required. <br /> 15064.3(b) <br /> c)Traffic Hazards PS TRANS-1:The project applicant shall meet with the County LS <br /> Engineer and the County Community Development <br /> Director, along with a representative of the Stockton <br /> Unified School District,to evaluate the need for crosswalks <br /> and associated signage and other alerting devices in the <br /> vicinity of the project site. Should it be determined that <br /> such additional facilities would be necessary,they shall be <br /> made a condition of approval for the project, and the <br /> project applicant shall pay fair-share costs for the <br /> Pock Lane Public Review Draft IS/MND 1-18 May 2022 <br /> LEGEND: NI = No Impact; LS=Less Than Significant; PS=Potentially Significant <br />