My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
760
>
1600 - Food Program
>
PR0546585
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2021 10:43:59 AM
Creation date
4/8/2021 4:35:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546585
PE
1624
FACILITY_ID
FA0026427
FACILITY_NAME
STARBUCKS #61207
STREET_NUMBER
760
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
760 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASEWORK PLAN <br /> CASEWORK FINISH SCHEDULE GENERAL NOTES7 <br /> ENGINE ZONE MATERIAL DESCRIPTION FINISH CODE COMMENTS <br /> 1'-2 1/2"— A. GENERAL CONTRACTOR TO NOTIFY CONSTRUCTION <br /> UNDERCOUNTER CABINET PLASTIC LAMINATE-BLACK PL0019 MANAGER IMMEDIATELY IF A DISCREPANCY EXISTS .■. <br /> INTERIOR BETWEEN CASEWORK SHOP DRAWINGS, EXISTING SITE <br /> CONDITIONS,ARCHITECTURAL DRAWINGS OR BUILT <br /> J 1' -3" CONCEPT FINISH <br /> FIXTURES. ALL DIMENSIONS SHALL BE FIELD VERIFIED <br /> W <br /> BACKBAR CASEWORK PLASTIC LAMINATE-GRAPHITE PL0003 BY GC PRIOR TO SHOP DRAWINGS PRODUCTION. <br /> C) c= C 17580 BACKBAR COUNTERTOPS COMPOSITE-CORIAN - RAIN CLOUD CP0002 <br /> N N LU ! CONDIMENT CART COUNTERTOP COMPOSITE-CORIAN - RAIN CLOUD CP0002 B. STARBUCKS CONSTRUCTION MANAGER TO COORDINATE <br /> N ~ CONDIMENT CART, MERCH BAY WOOD-WHITE OAK WD0073 AND SCHEDULE CASEWORK DELIVERY DATE. GENERAL <br /> EXTERIOR CONTRACTOR TO CONFIRM CASEWORK DELIVERY DATE <br /> 00 C 17829 ESPRESSO COUNTERTOPS STAINLESS STEEL-#4 BRUSHED 16GA #4 BRUSHED WITH CASEWORK MANUFACTURER AT FOUR(4)WEEKS ©2011 STARBUCKS COFFEE <br /> U) iv O C c20000(2) 16GA PRIOR AND THEN ONE (1)WEEK PRIOR TO SCHEDULED <br /> o DATE OF DELIVERY. STARBUCKS COFFEE <br /> = C 17742 ESPRESSO FINISH PANELS WOOD-WHITE OAK WD0073 <br /> cn C 17580 LDDEI <br /> ❑❑❑❑LO El= C c20001 (2) ESPRESSO HAND-OFF PLANE COMPOSITE-CORIAN - RAIN CLOUD CP0002 C. STARBUCKS CONTRACTS DIRECTLY WITH CASEWORK <br /> ESPRESSO TOP CAP, CAFE QUEUE COMPOSITE-CORIAN - RAIN CLOUD CP0002 STRAIGHT EDGE VENDOR TO SUPPLY CASEWORK LISTED IN THE COMPANY <br /> ca o BAR,AND SIT-HERE TOPS CASEWORK SCHEDULE, UNLESS OTHERWISE NOTED. 2401 UTAH AVENUE SOUTH <br /> M/7/ <br /> FINISH PANEL BRACKETS COLD ROLLED STEEL MT0002 SEATTLE, WASHINGTON 98134 <br /> - FINISH PANEL TRIM HOT ROLLED STEEL WITH MATTE SEALER MT0011 D. CASEWORK VENDOR TO PROVIDE COMPLETE SHOP 206 318-1575 <br /> N DRAWINGS AND INSTALLATION PACKAGE TO GENERAL <br /> C 17581 FRONTBAR COUNTERTOPS COMPOSITE-CORIAN-RAIN CLOUD CP0002 CONTRACTOR TO FACILITATE PROPER INSTALLATION. <br /> °' FRONTBAR FINISH PANELS WOOD-WHITE OAK WD0073 THESE DRAWINGS AND SPECIFICATIONS ARE <br /> U CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> 06 1' - 10 1/2" MISCELLANEOUS FINISH E. REFER TO CASEWORK INSTALLATION MANUAL PROPERTY OF STARBUCKS CORPORATION,WHICH IS <br /> ESPRESSO, CUSTOMER BAR TEMPERED GLASS PROVIDED BY CASEWORK VENDOR FOR COMPLETE THE OWNER OF THE COPYRIGHT IN THIS WORK. <br /> ' CBE SHELF SNEEZE GUARD INSTALLATION INSTRUCTIONS. THEY SHALL NOT BE REPRODUCED(IN WHOLE OR IN <br /> til ESPRESSO, CUSTOMER BAR STAINLESS STEEL-#4 BRUSHED 16GA PART), SHARED WITH THIRD PARTIES OR USED IN AN <br /> p F. ALL CASEWORK BOX BASE/TOE KICKS SHALL BE SET <br /> ENLARGED CBE SHELVE - ABOVE DRIVE-THRU POS CUBBY - ABOVE SHROUD AT POS SNEEZEGUARDHAR NTBA SST MANNER <br /> SPROJE OTHER <br /> PROJECT <br /> OJECTS UTTHE RIORWRI EXTENSIONS <br /> TEN <br /> N AND LEVELED USING 1/4" (6 MM) NON-ABSORBENT THIS PROJECT WITHOUT THE PRIOR WRITTEN <br /> p 2 3 4 ESPRESSO, POS, FRONTBAR PLASTIC LAMINATE-GRAPHITE PL0003 PLASTIC SHIMS PROVIDED BY CASEWORK VENDOR. CONSENT OF STARBUCKS CORPORATION. THESE <br /> X scale: 1/2" = V-0" scale 1/2"= 1'-0" scale: 1/2"= 1'-0" DRAWINGS AND SPECIFICATIONS ARE INTENDED TO <br /> ABINET BACK <br /> 00 HAND SINK COUNTERTOP STAINLESS STEEL-#4 BRUSHED 16GA G. SEE WALL FINISH PLAN & INTERIOR ELEVATIONS FOR EXPRESS DESIGN INTENT FOR A PROTOTYPICAL <br /> SST LOCATION, TAGGING, AND FINISH SCHEDULES OF STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE <br /> � <br /> I APPLIED WALL TREATMENTS. AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE <br /> N CONDITIONS. NEITHER PARTY SHALL HAVE ANY <br /> p H. DO NOT CAULK TRASH RINGS TO COUNTERTOPS. OBLIGATION NOR LIABILITY TO THE OTHER(EXCEPT <br /> STATED ABOVE)UNTIL A WRITTEN AGREEMENT IS <br /> 0 <br /> N J. SEE REFLECTED CEILING PLAN FOR CASEWORK SOFFIT FULLY EXECUTED BY BOTH PARTIES. <br /> 4 LOCATIONS. <br /> N <br /> �I REFER TO UPPER SHELVING ATTACHMENT DESIGN ARCHITECT OF RECORD <br /> DETAIL FOR INSTALLATION INFORMATION. <br /> E5 <br /> E K. ALL COUNTERTOPS UTILIZED FOR CUSTOMER a � o — • <br /> TRANSACTIONS, INCLUDING BAR, CONDIMENT AND U <br /> SALES COUNTERTOPS SHALL BE INSTALLED AT 2'-10" m <br /> co <br /> (860 MM) MAXIMUM A.F.F. <br /> E IWI <br /> N L. REFERENCE PLUMBING AND ELECTRICAL PLANS FOR m c g a r c h i t e c u r <br /> D- C 17747 CABINET PLACEMENT OF ELECTRICAL, DATA AND PLUMBING ON <br /> 2 4'-0 1/2" C 17741 CABINET FRONT AND BACKLINE OF BAR. 111 Pacifica, Suite 280, Irving, CA 92618 <br /> P:949.553.1117 F:949.474.7056 <br /> C� 1102 C 17743 CABINET <br /> M. INSTALL CASEWORK, COUNTERTOPS, SHELVES, <br /> liFCUBBIES, FINISHES, TRIM AND TABLE TOPS <br /> _ _ ARCHITECT STAMP <br /> 0 r3 THROUGHOUT. REFERENCE FINISH SCHEDULE AND <br /> d _ 1102 MANUFACTURER'S SPECIFICATIONS FOR ADDITIONAL <br /> 5 C 17897 INFORMATION. G� PPE WIN <br /> (n 1504.1 I C 17574 C 17745 -� <br /> N. WALL FINISH BEHIND EXPOSED CABINETRY AND BELOW <br /> _0 CABINET=C :U C 17747 _� C 17741 C 17810 UNDERSIDE OF COUNTERTOP SUBSTRATE TO BE FRP. 1839� � 5'- 1 1/2"CABINET C 17574 O 18722 C 18722 C 17574 1 <br /> II C 17824 17740 C 17896 C 17747 P. CASEWORK VENDOR TO ENGINEER PROPER <br /> II I COUNTERTOP COUNTERTOP SUPPORT AT ESPRESSO BAR AND <br /> Q _ _ OTHER WORKSTATIONS PER STARBUCKS MINIMUM F CALIFO <br /> O L —� 2 O O O O O O <br /> PERFORMANCE REQUIREMENTS. <br /> S PORTS(s) C 12809 i o C 20059 <br /> El <br /> v 17573 <br /> N 1504.1 — — C 17747 C 192 A � �� � % CASEWORK PLAN KEYNOTES <br /> CD I C 20050 0056 L, BACKBAR C 28 SNEEZE(-, D C 2 17810� C 19713 iv <br /> O COUNTERTOP COUNTERTOP <br /> C 17745 COUNTERTOP COUNTERTOP COUNTERTOP \ <br /> U) NTERTOP(; 10000 � 'COUNTERTOP COUNTERTOP MCABINETS <br /> 2 C 19284 SHROUD COUNTERTOP 4 � 10 PROVIDE 12" SPLASHBOARD AT BACKBAR HAND SINK. <br /> z I C 17840 20271 C 18 1 COUNTERTOP C 178303' - 10"1102 FLOOR SINK BELOW. CASEWORK MANUFACTURER TO <br /> I SHPANELC 10001 2'_2" L O COORDINATE DESIGN TO INSURE THIS AREA IS PEADILY Q <br /> �I DIEWALL C 10002 , ACCESSIBLE FOR CLEANING AND FREE OF COUNTERTOP <br /> SUPPORT. Q <br /> � <br /> o o LL > N <br /> LO <br /> CABINET C 17745 COUNTERTOP 19282 SALES WORKROOM LU Q <br /> DIEWALL C 17846 DIEWALL C 18865 DIEWALL C 19285 DIEWALL C 18872 C 17744 C 17831 DIEWALLFINISH <br /> ( 1 <br /> FINISH PANEL C 17848 PANEL Ci 18717 FINISH PANEL C 19286 FINISH PANEL Ci 18873 C 17743 C 17832 FINISH PANEL \•/^ <br /> CAP C 19283 CABINET C 17745 C 17743 LU � Q_ z <br /> � CABINETS AT C <br /> („) 2 POS STATION C � ! , O <br /> 06 1504.1 (9) C 20100 Z U Q v <br /> (24)C 20120 U 06b <br /> �I W W U <br /> CN LOo0 E 0 O <br /> co aL a (.C) <br /> I` Cn <br /> I <br /> STORE #: TBD <br /> co ® PROJECT #: 85426-001 <br /> N <br /> d7 CASEWORK CONCEPT: CORE <br /> RESTROOM VESTIBULE ISSUE DATE: <br /> 1 CAFE/SEATING <br /> 1504.1 <br /> PROGRAM MANAGER: <br /> LEGEND STORE DESIGNER: S.BLEVINS <br /> m LEEDOAP: N/A <br /> Q _ _ <br /> INDICATES STAINLESS STEEL (SST)COUNTERTOP CHECKED BY: <br /> MCG PROJECT#: 19236 <br /> C) INDICATES SOLID SURFACE (SS) COUNTERTOP MCG PROJ. MANAGER: C.LEE <br /> MCG PROJ.SPECIALIST: SKIM <br /> N DATUM POINT <br /> 00 C 40002 C 40002 Revision Schedule <br /> d UNISEX UNISEX C 12345 CASEWORK TAG <br /> rn Rev Date By Description <br /> RESTROOM A RESTROOM B <br /> 0 <br /> N <br /> I I <br /> dT-5" I SHEET TITLE: <br /> 30' -4" CASEWORK PLAN <br /> 0 <br /> N <br /> SCALE:AS SHOWN <br /> CD 1ST FLOOR - CASEWORK PLAN z 0 2 4' 8' <br /> SHEET NUMBER: <br /> N <br /> _ scale: 1/4" = 1'-0" <br /> Scale: _ - <br /> N <br />
The URL can be used to link to this page
Your browser does not support the video tag.