Laserfiche WebLink
<br /> <br /> <br /> made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-PS-87 2-PS-91 <br />Sump Manufacturer Western FG Western FG <br />Sump Depth (inches) 40" 40" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" 17" <br />Test Start Time 12:57 1:02 <br />Initial Reading .001 .001 <br />Test End Time 1:27 1:32 <br />Final Reading .001 .001 <br />Change in Reading 0 0 <br />Pass/Fail Criteria > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br />Sump Manufacturer Western FG Western FG Bravo Bravo <br />Sump Depth (inches) 24" 24" 27" 27" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />7" 7" 7" 7" <br />Test Start Time 11:57 12:02 12:47 1:27 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 12:27 12:32 1:17 1:57 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST