My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:30 PM
Creation date
4/13/2021 3:20:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Environmental <br />PERSONAL PROTECTIVE EQUIPMENT <br />SITE SAFETY PLAN <br />As a minimum Level D protection is required on all Smith Environmental worksites. Level D <br />includes: <br />✓ Steel toed boots <br />✓ Safety Glasses <br />✓ Hard Hat <br />For each task on this project, identify additional protective garments as required, include the <br />conditions under which the level of PPE would be modified for each task. <br />Task(s) <br />Condition <br />Personnel <br />Garment(s) <br />Working Near Vehicle <br />Orange Vests <br />1 <br />>20 ppm for 5 minutes <br />1/2 Face Respirator <br />1 <br />>200 ppm for 5 minutes <br />Evacuate Site <br />Full Face Respirator <br />SITE CONTROL AND COMMUNICATIONS <br />The buddy system must be used on all Smith Environmental hazardous waste sites. <br />Site will be secured as follows: Fencing will be used when possible. <br />Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br />work zone. <br />MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE. <br />PACE 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.