My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:30 PM
Creation date
4/13/2021 3:20:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Environmental Technologies Corporation <br />Quality Assurance/Quality Control Plan <br />Revised February 1995 <br />The chain -of -custody record will contain the following information: <br />✓ site name <br />✓ signature of collector <br />✓ date and time of collection <br />✓ sample identification number(s) <br />✓ number of containers in sample set <br />✓ description of sample and container(s) <br />✓ name and signature of persons, and the companies or agencies they represent, <br />who are involved in the chain of possession <br />✓ inclusive dates and times of possession <br />✓ requested analysis for each sample <br />5.3 Delivery of Samples to Laboratory <br />Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated to <br />approximately 4°C for shipping. Shipping containers will be sealed with security tape to assure <br />sample integrity during shipping. Delivered samples will be accompanied by a chain -of -custody <br />record. The laboratory shall note on the chain -of -custody that samples were properly <br />preserved and security tape was intact upon arrival. <br />6.0 SAMPLING AND DR .T.7NG EQUIPMENT DECONTAMINATION <br />All equipment used for drilling and sampling will be decontaminated prior to use. All equipment used <br />for collection of more than one sample, such as bailers and spoons, will be decontaminated between <br />each use to prevent cross contamination between samples. DnIling equipment will be decontaminated <br />prior to commencing drilling at each hole. Well construction materials will be cleaned as necessary, <br />prior to installation <br />m:�..\sheils\QAQG95. WP5 <br />4 <br />• <br />SIRH <br />
The URL can be used to link to this page
Your browser does not support the video tag.