My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:30 PM
Creation date
4/13/2021 3:20:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Environmental Technologies Corporation <br />Quality Assurance/Quality Control Ply <br />Revised February 1995 <br />Equipment and well material decontamination will be conducted on an impermeable surface and all <br />decontamination eluent will be contained. All surfaces of the equipment will be thoroughly <br />decontaminated using a steam cleaner. The equipment will be placed on a drying rack for air drying. <br />The decontamination water will be stored in containers certified for hazardous materials storage and <br />disposed of in an approved manner. <br />Sample equipment to be used for pesticides and organic analysis will be washed in a nonphosphate <br />detergent (Alconox or equivalent) and rinsed with tap water, followed by deionized water. If the <br />equipment is for metals analysis, the initial rinse will be conducted with 0.1 N nitric acid followed by <br />tap water and deionized water. <br />7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br />The following measuring equipment may be used during the Remedial Investigation. Equipment is <br />grouped by field activity. Calibration procedures and frequency are listed by piece. <br />Soil Borings and Well Dimensions <br />Steel and coated cloth tape. Calibration: none. <br />Water Level Measurements in Wells <br />Steel surveyors tape. Calibration: manufacturer supplied temperature correction will be applied <br />as applicable for field conditions. Electrical well sounders. Calibration: check against steel <br />surveyor's tape. <br />m:� ..\shellslQAQC-95. WP5 <br />5 <br />• <br />SKIN <br />
The URL can be used to link to this page
Your browser does not support the video tag.