My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26056
>
2900 - Site Mitigation Program
>
PR0545730
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2021 3:30:30 PM
Creation date
4/13/2021 3:20:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545730
PE
2957
FACILITY_ID
FA0005194
FACILITY_NAME
DONNA GARDNER
STREET_NUMBER
26056
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115046
CURRENT_STATUS
02
SITE_LOCATION
26056 THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Remediation Plan <br />Thornton, California <br />July 22, 1992 <br />Page 3 <br />PROPOSED WORK <br />Excavation <br />Suspected hydrocarbon impacted soils will be excavated by a licensed California contractor, <br />employing a backhoe tractor to perform the excavation. RESNA Industries, California <br />Contractor No. 629796 will act as primary contractor. <br />Excavated soils will be field screened by employing a photo ionization detection (PID) meter, <br />calibrated to an isobutylene standard. Clean soils will be stockpiled separately from the <br />impacted soils based upon field observations, i.e., odor, discoloration, PID readings. <br />Hydrocarbon impacted soils will be covered and underlain by 6 mil plastic sheeting pending <br />results of laboratory analysis for the determination of the appropriate remediation/disposal <br />method. <br />Confirmation Sampling <br />Upon the removal of the contaminated soil, five confirmation soil samples will be collected, one <br />from the excavation floor, and four from the sidewalls at appropriate depths to verify source <br />removal. Samples will be analyzed by a state certified RESNA Environmental Laboratory for <br />BTEX and TPHG utilizing EPA Methods 8020 and Modified 8015, respectively. <br />Backfilling <br />Subsequent to the collection of confirmation soil samples, the excavation will be backfilled with <br />the clean excavated soils, engineered sand, and/or pea gravel under the requirements set forth <br />by San Joaquin County. <br />GPLRC792.TJL <br />
The URL can be used to link to this page
Your browser does not support the video tag.