Laserfiche WebLink
Thornton Operation Progress, Inc. <br />August 9, 1991 <br />Page 2 <br />you. The above ground completion can also be retro-fitted to a <br />flush grade completion at a later date if it would be more <br />convenient for future use of the property. Once the well is <br />installed it will likely be monitored on a quarterly basis (four <br />times per year) for the duration of the investigation. An <br />investigation of this scope typically has a duration of 2-3 years. <br />The results of each sampling event can be provided at your request. <br />At the conclusion of the investigation the well will be destroyed <br />in accordance with local and state regulations. <br />Pending your authorization, the monitoring well is expected to be <br />installed at the end of August. If you find our request acceptable <br />and intend to grant permission to install a monitoring well on the <br />property in question, please provide the appropriate signature <br />where indicated below to authorize WaterWork to complete the well. <br />If you have any questions regarding our request please contact me <br />in our Escalon office 209/838-3507. <br />Respectfully, <br />RESNA Industries/WaterWork Corp. <br />J hn P. Lane <br />P oject Geologist <br />JPL/ggk <br />Pc: Mr. Al Hoslett <br />I hereby authorize WaterWork to access the property <br />in question to complete the work as outlined above: <br />'77 p__egY4 Signature Date ido/d/ <br />Title <br />GPL0809A.WP