My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9504
>
1900 - Hazardous Materials Program
>
PR0520897
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 10:52:23 AM
Creation date
4/15/2021 1:31:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0520897
PE
1921
FACILITY_ID
FA0009485
FACILITY_NAME
FRENCH CAMP GRAIN ELEVATOR
STREET_NUMBER
9504
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321002
CURRENT_STATUS
01
SITE_LOCATION
9504 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMERGENCY ACTION PLAN <br /> This is French Camp Crain Elevators, LI.,(W Emergency .Faction Plan. It meas all OSHA <br /> requirements and applies to all our work operations. <br /> Introduction: <br /> Because of the seriousness of the safety and health hazards related to emergency response <br /> operations, we have adopted this Emergency Action flan in order to cover those emergency <br /> situations in which action.trust be taken to ensure safety from tare, explosion and any other <br /> emergencies. <br /> We have adapted this program in order to implement 29 G.F.R. 1910.38, the OSHA standard <br /> regulating Employee emergency plans. This Emergency Action Plan is designed to identify, <br /> evaluate, and control safety and health hazards, and provide emergency response procedures. <br /> Our plan will be periodically updated as needed. It will be made available to all affected <br /> employees, and to our contractors and subcontractors so that they will know what to do when <br /> their workers are on our premises. Our contractors and subcontractors will also be informed of <br /> potential fire or explosion hazards before they enter the worksite. In any emergency the <br /> evacuation meeting location will be the park bench located outside of the office. <br /> Scope and Application: <br /> Proper planning and response are important elements of our Emergency Action Plan. <br /> There are OSHA standards that require that we develop and implement a written Emergency <br /> Action Plan to handle possible emergencies before performing operations. We have done that. <br /> Our plan is explained below. <br /> Our Emergency Action Plan includes onsite and offsite personnel with specific emergency <br /> response roles, but will also cover others who may be on site, such as contractors and visitors. <br /> All personnel, whether directly involved in emergency response or not, should know their own <br /> responsibilities in an emergency. They must also know the names of those in authority, and the <br /> extent of that authority. Any person, who does not know, is obligated to request that information <br /> from their immediate supervisor at once. <br /> In any emergency situation, one person must be able to assume total control and decisionmaking <br /> on site. For this company,that person will be: <br />
The URL can be used to link to this page
Your browser does not support the video tag.