Laserfiche WebLink
Consolidated Forwarc. Landfill <br /> Page 6 <br /> grinder/screener have a sufficient moisture content to prevent ge=a:.on of visible dust <br /> or particulate matter. <br /> 14 (D.5) <br /> Proposed as Part of the Project: <br /> Measures that reduce landfill r:affic and operations impacts through&.e use of Best Available <br /> Control Methods(BACMs) as defined by the San Joaquin Valley Un:`ed Air Pollution <br /> Control District(SJVUAPCD) shall be required to reduce this cumul-_ive impact. <br /> 1 Austin 1994(GS.b),Austin 2000(GS.b) <br /> Excessively odorous wastes shall be m::red intntediately with other Iar.4-?l ::astes, depending <br /> on their nature and source. If diluting the intensity of odor is not sutTc�4 en:. then the operator <br /> shall immediately comer of ettsive n::aerials as soon as they arrive at ti:' landfill. <br /> 16 Austin 1994(GS.c),Austin 2000(GS.c) <br /> The operatorshall ensure that loadin,. unloading, and material hand.;"':),cctivities are <br /> carried out efficiently and::ithout deLz.vs to avoid excessive odors. <br /> 17 Forward 1993(DI) <br /> Use water trucks and/or sprinkler sys:en s to apply water a minimtun �=-Nice daily,to <br /> roadways and active faces of asbestos disposal areas to minimize airb-orne oust leaving the <br /> site. It is recognized that a balance insist be struck between maintaining s u7-,izcient moisture <br /> for dust control and applying too ntttc moisture such that the generatior. o'e'rcess leachate <br /> occurs. The conditions of the active races of'a landfill, as well as the leachate generated, <br /> must be monitored and professional fudgtnent utilized at all times to keep these two factors in <br /> balance. <br /> 18 Forward 1993(D2) <br /> Portions of the site that either have been filled to the extent allowed or are not expected to be <br /> worked for extended periods(six months or longer)shall be sown with fast-germinating <br /> drought-tolerant grass seed and watered until a cover of vegetation is established. <br /> 19 Austin 1994'(Gl.b),Austin 2000(GLb)(similar) <br /> The project sponsor shall seek to minimize the extent of area exposed to wird erosion. <br /> Exposed surfaces,including stockpiles,shall be vegetated to the extent possible. C <br /> 20 Austin 1994(GI-C),Austin 2000(GI.c) <br /> Plan and phase construction and closure operations such that they do not take place <br /> simultaneously on dry windy days. Schedule particularly dusty activities on separate days. <br /> 21 Austin 1994(GI.d),Austin 2000(GI.d) <br /> Design the site filling plan to facilitate screening of the active face from the prevailing winds, - <br /> whenever possible, to minimize the amount of windblown dust released fron the working <br /> face. <br /> 22 Austin 1994(G].e),Austin 2000(GI.e) <br /> Haul trucks carrying easily airborne ma:erial shall be covered during tray.port and sprayed <br /> with water prior to dumping if it is sho::?: that this would reduce dust emissfors during off- <br /> loading activities within the landfill. <br /> 23 Austin 1994(GI.fi,Austin 2000(Glfj <br />