Laserfiche WebLink
Page 5 <br /> Consolidated Forward Ing ndtill <br /> Tice contractor shall be required to employ the quie:es: among alternative equipment or to <br /> ,ntrfjlelcontrol noise front available equipment. <br /> 9 Forward 1993 (E2) - rte^ to actory specifications. <br /> tluftlE2 ingof equipsver='used on site shall be marc. J <br /> IO Austin 1994 (HI.a) (sintilar)..4ustin 2000(HI-a) �� Counr% Noise Standards contained in <br /> Ti:e proposed projcc=??l an. <br /> conform to the San JJ- be required to demonstrate <br /> se <br /> tiie County's Gener.:i Plan. The project sponsor=- - <br /> rk <br /> es <br /> con:pl <br /> iance tivirh t;:_performance standard. %%'ar% rea Ic could be limited, <br /> berms cold betdesigned. <br /> to the r•esidenc�co N.L.be rescheduled, noise 6=rr - <br /> ,:rd noise ntonirvra:;shall be undertaken to den==r�='�=' co"�Pliance in the event noise <br /> complaints are recen-ed. <br /> 11 Austin 1994 (Hl.b),Austin 2000(Hl.b) <br /> r :,t, o-=arty residential use would <br /> ,- --,�•, or 5 dBa during the daytime, then <br /> _ project-refaced n�}az levels measured at tl:-p �:-� -•• `• <br /> n:ardatory. As recommended in the <br /> ' <br /> exceed an hourly-c:'�erCtge of 45 dBa during •� _ r.:� •-••� •` <br /> setbacks and a lin:::�:ion on hours of operations ='•=- <br /> onvard, Inc. <br /> Lai:, Use Permit Modif ca=ion== =' o?r`o't of a soundwall at 9690 Austin <br /> Road shall be to the resident. <br /> D. AIR QLL-1LITY/ODORS <br /> 12 (D') <br /> Identified in This EIR: n�- ROG increase by developing gas <br /> The project sponsor shall mitigate any signiftca:-_: cfm- <br /> within the Fon�•ard Landfill sufficient to acrieve recovery <br /> into the on olida edf <br /> wells _ <br /> LFG from the Fon��ard Landfill. The gas«ells ifieant ROG increase from <br /> facility collection`disposal system. To maintain a 1��ns1gri led at the currently <br /> existing conditions,a small LFG collection system ll before the total inavased fugitive LFG release rate from all <br /> uncontrolled ForWM-Landfiuivalent to 10 tons of ROG per year). <br /> sources reaches 150 cfrn(equivalent <br /> i <br /> 13(D.4) i <br /> of the Project: <br /> Proposed as Part per day, <br /> a. Water any exca%•ation areas twice p I <br /> b. Water stockpile haul roads at least once per day. day.that the road is used,* <br /> c. Water the perimeter facility road once per day on any <br /> -site t a�'el speed to speeds less than those that would cause visible dust emissions <br /> d. Limit on ! <br /> behind the vesicle, <br /> e. Prevent track-oat of mud and did or road of at least 100 feet in length to allow mud <br /> 1) Pro�z�g a paved ul <br /> and dirt to drop off before exiting the site, <br /> 2 Removing dirt and mud from intenor R ad at�therend of eachoughout work-day. <br /> 3) Rer-:o. ng any dirt deposition on '�z.- <br /> �� - <br /> 1 all-«�ea:-'r surfacing to any unp.- e� :ore ��="mzR:that carries 50 or more vehte e <br /> f. Apply 0 dad-s. <br /> trips per da.:_ontinuously for more ---z <br /> - <br /> a. ,Vater unpave=equipment parking areas loperationring of the <br /> �� -_ t practices shall be fol o� :e ^- all"C all include assunLe;z during that inputs to the <br /> h. Best mana_.�t" P <br /> grinder scr:.'er at the composting 0-.De--al, On- an <br />