My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 8:46:17 AM
Creation date
4/20/2021 10:34:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2003
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 <br /> Consolidated Forwardlnc dfill <br /> • a three day approved asbestos workers training program <br /> • any asbestos training program specific to landfill <br /> e dthe employees <br /> I pVMB or Cal-OSHA that has n develop---, <br /> described, or required by regulation by <br /> s training program approved by Cal-OSHA <br /> any other asbesto <br /> (c) Provision of water at the working face to keep ACNI damp until covered. <br /> Continuation of the annual physical evaluations of a'.1 on-site Forward employees for as-_:_=== ;) <br /> exposure. <br /> Workers will not be allowed to eat near the active la-jn11. <br /> 32 Austin 1994(Ll f},Austin 2000(Ll.f} with <br /> have <br /> Working clothes front corkers litho 12a�dthad <br /> rect clout:co?:`.i'htitastesL(s(such as}equipine':- <br /> performed operations that mai'lrti of <br /> maintenance operations <br /> asbestos handling) should be left be;:ind at the landfill and cleaned by <br /> Changing areas should be provided at the project site so that workers do not care =- <br /> off-site;and <br /> :on-washable Trellis should be removed by ti'acuunung, not br:ls%::=-_ <br /> Dust accumulated on l =` ' <br /> blowing. <br /> 33 (E.2) <br /> Proposed as Part of the Project: ,,which is designed to mitigate against <br /> The Forward Landfill ''load-checking program, <br /> the landfill,will continue to be implemented.for the <br /> hazardous waste being placed in <br /> consolidated landfill <br /> Landfill operators will be trained t®recognize and properly segregate and handle hazardous <br /> waste materials management training program <br /> waste. This will include a 24-hour hazardous 111 <br /> that complies with 29 CFR,Section 1910. <br /> 34(E.3) k <br /> Proposed as Part of the Project: listed in the Forward,Inc.Site Health and Safety I <br /> The Standard Safe Work practicesimplemented by the operator-and Contingency Plan will be imp i <br /> operator will comply with the provisions of CCR Title 27, Section 20590,afii�h I I <br /> The landfill P roved safety equipment for personal heath and <br /> requires that O&M personnel wear and use app <br /> safety. - <br /> Landfill access will continue to be controlled to limit unauthorized entry by persons o-- <br /> vehicles. <br /> CCR,Title 27, <br /> The landfill operator will comply'«'ith all provisionll oo and appropriat Isafet,, equic--t--:1 3, <br /> Subchapter 4, Articles 1-3. (requires personnel tr_ <br /> that apply to landfill health and safety. <br /> Identified in This EIR: <br />
The URL can be used to link to this page
Your browser does not support the video tag.