Laserfiche WebLink
Consolidated Forwar6c. Landfill Page 10 <br /> If future spills or accidents during waste transport indicate th.-- changes should be made to <br /> waste transport haul routes to the landfill from major arterials. SR 4 or Highway 99, the San <br /> Joaquin County Public Works Department shall modify the ha----' routes as appropriate. <br /> 35 (E.4) <br /> Proposed as Part of the Project: <br /> Where required by State and Federal regulations, the landfill pz:- monitoring, gas control and <br /> collection system will be installed, extending to the new areas c:=t^;e expanding landfill and <br /> operating in conformance%with applicable regulations. <br /> The existing gas extraction system, or an equivalent system, iy: continue to operate. <br /> Regular gas monitoring will be conducted to prevent explosive .oxic gas accumulation in <br /> onsite buildings or beneath temporary buildings. The landfill will install an <br /> automatic combustible gas detection and alarm system for sr-,:r:-_:7 zs at the site. <br /> The landfill operator will not con3truct or otherwise locate an, —:_tore in an area of lcno«n <br /> landfill gas build-up. <br /> All site personnel who work in permanent structures will be t-a.-eto use and respond to the <br /> landfill gas monitoring and alar:: system. <br /> Identified in This EIR: <br /> Landfill gas monitoring shall include volatile organic compounCS order to determine the ! <br /> amount of contaminant recovery, and the landfill gas control sy-s_ will control potential <br /> exposure to on site personnel: <br /> 36(E.5) <br /> Identified in This EIR: <br /> The landfill operator shall submit an updated post-closure permit application for Y;W-A <br /> that presents plans to prohibit the expansion of the new landfill areas above VVWJ-A. The <br /> applicant filed a renewal of its hazardous waste permit for -A on October 31,2000 <br /> (Kleinfelder,2000)that presents the controls and monitoring o A. The applicant's <br /> JTD describes creating a wedge of landfill material north of A that would keep a <br /> buffer area around the WMU-A boundaries clear of new refuse and dien start to build <br /> outward and upward. This plan must have the approval of the and RWQCB. E <br /> 37(E.6) <br /> Proposed as Part of the Project: <br /> The landfill operator will follow legally required daily or alterna " cover practices. <br /> The landfill will continue to ban intact tires(which collect water serve as a breeding <br /> ground for vectors)and large-dead animals from disposal at the landfill. <br /> Existing measures to discourage birds from the landfill will be conW:ued. <br /> Appropriate landfill personnel will periodically monitor the land,.;.,--- for the presence of <br /> vectors and take preventative action v.-here required, and landfill ins—_,,ections will be <br /> documented in the landfill operations administrative file. <br /> 38 (E.7) <br />