Laserfiche WebLink
Page 13 <br /> Consolidated For`vard In ndfill <br /> site. The surface-water collection drai-. system will be designed to divert the water to the <br /> storm water collection basin in the sou:nwest corner of the current Austin Road Landfill, at <br /> times when enough surface water acc=.-:ulates to have discharged into the collection basin. <br /> All waste at the proposed Forward Landnll will be separated from the north and south <br /> branches of Littlejohn Creek by a levee s`'stem or other acceptable method designed to <br /> protect the site from a 100-year flood event. <br /> The project includes channel reconfig�'ation and localized flood protection berms to isolate <br /> the landfill surfaces from floodwaters. <br /> Yee <br /> The project design also includes proV=_on of replacement <br /> flouth Fork of South Littlejohn odplain area and storag <br /> glume <br /> in an easement along the relocated\c._a Bran <br /> ch ofCreek. <br /> The channel and floodplain storage ea:-e•llent are designed to accommodate the 100-year, 24- <br /> hour storm. The design also includes =;nree-foot freeboard. <br /> 45 (F.2) <br /> Proposed as Part of the Project: <br /> The JTD articulates the programs of,-- na°e control structures and monitoring to inhibit <br /> ntrol system <br /> erosion and sedimentation. Propose s =-uctural aint nanc ontrols `ofdthe drainage e the �ys om b�'keeP n° <br /> and daily cover. Operational cortro:_ elude m <br /> ditches clear of debris and excessive:-egetation, and making needed repairs to dramase � <br /> i�e implemented if inspections show excessive erosion or <br /> structures. Corrective measures wzl <br /> v removing loose debris <br /> damage to drainage channels. Eroded compeas acting e mi <br /> the area.tizated bMon Monitoring and protection <br /> followed by replacement,regrading, <br /> against sediment from entering the Littlejohns stream channel will be implemented,including <br /> the diversion of part of Littlejohn Creek farther away from the landfilled area. <br /> in order to minimize sediment rt to the Littlejohns Creek,landfill slopes,ridgetops, ' <br /> and peripheral areas will be rev to inhibit erosion. <br /> 46(F3) <br /> Proposed as Part of the Project: <br /> The liner and leachate collection landfill and thor eextension of the existing leachate collectione expansion system—both over the top of s <br /> existing unlined Austin Road <br /> system at Forward--have been designed to meet or exceed the regulatory requirements as <br /> shown and discussed in the applicants JTD. The JTD and the a dequacRy`�oQf CB leachate <br /> collection system and associated monitoring are under re z y <br /> The re ulatory required separation between the liner and groundwater will be implemented to <br /> g <br /> - allow for chemicals in the leachate to attenuate before reaching the groundwater, should the <br /> leachate breach the collection system. <br /> The project design includes a leak detection system under the sumps. <br /> The liner system will be overlain by a protective operations laver consisting of a one <br /> thickness of soil and gone-foot thick gravel layer that serves as the leachate collection layer. <br /> This two-foot layer will serve to p-orect the liner system from sharp or jagged materials the <br /> in <br /> waste. <br />