My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 8:46:17 AM
Creation date
4/20/2021 10:34:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2003
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forwac. Landfill Page 14 <br /> The operator will remove any hazardous materials spotted during delivery,thus minimizing <br /> the potential for leachate contamination if a break occurs in the liner or the leachate collection <br /> system. <br /> A double Iiner shall be installed under the sump area.as required by the RWQCB; <br /> EIectric testing of the liner in each Waste Management Uni:shall be conducted before waste <br /> can be disposed in that Unit, as required by the RWQCB: and <br /> Identified in This EIR: <br /> If any modifications to the leachate collection system and, associated monitoring described in <br /> the JTD are required the RWQCB, the landfill operator sha': implement those changes. <br /> 47 (F.4) <br /> Proposed as Part of the Project: <br /> Proposed measures to address concerns about addition-1lea."ate generation as a result of the <br /> combined landfill have been addressed in the JTD with the:-esentation of the EPA HELP <br /> model results based on the projected volumes of refuse. and :::e description of the leachate <br /> collection system designed to meet the maximum probable 1e_:,hate generated. Engineering <br /> control systems (leachate collection system, drainage conco:. groundwater and vas controls), <br /> monitoring programs, and institutional controls have be.n pr.sented in the JTD currently <br /> under review at the RWQCB. Reporting on leachate genera:ion volume and quality is a <br /> requirement of the RWQCB-stipulated progress reporting t.-ouch the various proposed <br /> IandfiIling phases. <br /> The landfill cell anchor trenches will be elevated two to three-feet above the surrounding land <br /> to minimize the possibility of water from major storm events draining into the cells and <br /> adding to the volume of leachate. <br /> Identified in This EER: <br /> Continued monitoring of the effectiveness of mitigation measures for leachate shall be <br /> performed by the responsible regulatory agencies(currently the RWQCB and,for the WMU- a <br /> A,the DTSQ. These agencies keep abreast of state-of-the-art information on leachate <br /> generation mechanisms and appropriate mitigation. If,in the future,monitoring demonstrates <br /> that the procedures above were insufficient to mitigate the effects of landfill-generated F <br /> leachate,the agencies will,as appropriate,require additional mitigation measures. <br /> 48(F.S7 <br /> Proposed as Part of the Project: { <br /> Maximum pre-loaded settlement of the combined landfill is projected in the JTD to provide <br /> the maximum period for settlement,and take advantage of anticipated improvements in' <br /> geosynthetic technology. <br /> Future design for the vertical expansion will, if necessary,include additional components in <br /> the liner system, depending on future differential settlement on the liner system. <br /> The extraction wells proposed as part of the Revised Engine.-n¢Feasibility Study(AEE, <br /> 2001B) will be maintained and monitored during combine-:la i11 build-out phases, and <br /> modified as needed based on the RWQCB's review of mon::o--.2 data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.