Laserfiche WebLink
Consolidated Forwar0c. Landfill Page 16 <br /> 51 (F.9) <br /> Identified in This EIR: <br /> Replacement wells (as well as additional wells north of the Austin Road Landfill to bet'_ - <br /> define the leading edge of the plume)shall be installe,J to mitigate against the loss of oc <br /> wells as presented in the JTD currently under revien ov the RWQCB. The RWQCB r--,:z- <br /> approve the JTD's plans for the number and locationc). the nen-wells as part of their <br /> approval process, which is separate from the EIR app-oval process. <br /> 52 Austin 1994(K3.c),Austin 2000(K3.c) <br /> The timing of the pumped discharge from the detenr ,:pc must not occur with the pe--=: <br /> flow rate of Little John's Creek as this would impaC,*,:v1.,r:srream•locarions by inereasir_ :::e <br /> flood hazard. Telemetry, which monitors theflow in : creek to determine the peak, <br /> be provided. This information should then be used to :C- 'n zte the start up of the pion: <br /> 53 Austin 1994(K5.e),Austin 2000(K5.e) <br /> The landfll operator would include practices acid pr-_:e i,--in rhe STTT-P to comply ti;::;: 3 <br /> 1760. The procedures would describe how the eipa,::: r ,:dfrll would salvage all <br /> economically feasible metallic discards. <br /> 54 Forward 1993 (C3) <br /> Dieselfuel should be stored in a manner which pror;;:2s- ;-secondan.containment. <br /> G. SOILS AND GEOLOGY <br /> 55 (G.2) <br /> Proposed as Part of the Project: <br /> Should additional cover material be needed, alternative daily covers,approved by the <br /> CIWMB,will be examined and used. <br /> 56(G.3) _ <br /> Proposed as Part of the Project: <br /> The project sponsor has prepared a seismicity study for the site. If the potential maximum <br /> peak ground acceleration in the seismicity study is greater than that assumed in the <br /> preliminary design,the final project design analysis will make modifications needed to meet <br /> the factor of safety(determinations may be subject to the approval of the CIWMB and/or <br /> RWQCB). Impacts to the new liner and drainage system installed over the Austin Road <br /> Landfill will be monitored as appropriate based on any stipulations of the CIWMB and/or <br /> RWQCB. <br /> 57 (G.4) <br /> Proposed as Part of the Project: <br /> Overall reduction--or, in some cases,elimination or improvement—of slope instability at tre <br /> project site-can be achieved through the implementation of the seismic design measures <br /> designed to meet CCR Title 27. <br /> 58 (G.5) <br /> Proposed as Part of the Project: <br /> The applicant's Joint Technical Document references an e-osion management plan that <br /> delineates various actions to minimize erosion and sedirnen.a:ion. including appropriate <br /> construction, landscaping, and maintenance of graded so-pes and subsurface drainage <br />