Laserfiche WebLink
Consolidated Forward Ireandfill Page 17 <br /> systems. As part of that plan,grading operations will be scce�--=d =O avoid the rainy season <br /> and be implemented by interim engineeringareas wherentrol ,erosior. -B ,�dtrnta on can be7- grading is ed, <br /> slopes will be directed to cam'runoff to ar <br /> controlled. Truck beds will be hosed down to reduce e oilsen sp`: - -°``.ztion roads <br /> entialto the <br /> blown dust. Relocation of Littlejohns Creek co <br /> creek. <br /> Completed cells will b:stabilized by the planting and main=r- =e o= crought-resistant <br /> -gasses. This will inhibit wind and water erosion and maxi_=z� -= =�''-htY of the soil in <br /> order to facilitate revegetation. <br /> -i=ons of surface water <br /> Temporary plantings.geofabric.drapes, and erosion-. 'e`'en_=_ <br /> will be constructed as app <br /> propriate on temporary slos. <br /> Regular operational ani post-closure monitoring of e-osior. _ ��ctures and plantings <br /> P <br /> will be done for a minimum of t"'e years. <br /> 59 Forward 1993 (B.S) <br /> urs <br /> Assessment of growu,'l::uer levels to monitoring iedt�tlercatlli,:r_'=T �r��%'or greateroat the <br /> following an earthqua.i�event having f r s�.sinic variations. In the <br /> landfill. This will alio,,,-tile,t;.rer level database to e adjus es o _ter quality sampling and <br /> event that anomalous :atzr level changes are noter.'. z seri <br /> testing events shall be initiated bt'the applicant <br /> 1'acz adjt sr^:,: in landfill ll�to detect an <br /> changes in water qualin-that n.ay signify subsurface <br /> 60 Forward 1993(B.6) well to o casing <br /> Benchmarks shall be established(these could utilize monitor ' p f f ill materials <br /> elevations), which will allow for determinations nnual barissand follaw�g significant seismic events <br /> in closed sections of the landfill on a are noted, the cause <br /> (Modified Mercalli Scale of V or above). In the event that changes <br /> should be determined as should the effect on leachate collecdOn and Should be accomplished <br /> coverY systems. <br /> Repair liners and LCRS as necessary. In addition, remedial gradrng <br /> to restore the original cap's function to repel water and direct surface runoff. <br /> H.BIOLOGICAL RESOURCES II <br /> 61 .2 <br /> Identified in This EIR: cutoff angles shall be used to focus light in <br /> Night lighting with sodium lamps with sharp <br /> active landfill areas(target areas)and to avoid nigh�e lighting of adjacent open areas and <br /> trees. <br /> 62 (H.3) <br /> ed <br /> Proposed as Part of the Project: guidelines deve <br /> As a participant in the SJCtiiSCP,Forward will <br /> incorporate <br /> ` rP°he z-�TC�=DbP and the Swainsonps <br /> to minimize effects of rodenticides to the garter <br /> Hawk(Appendix A of the SJCN1SCP). <br /> Identified in This EIR: <br />