Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation Monitoring and Reporting Program Checklist Page 35 ; <br /> ' Inq�lcmentation , <br /> Mitigation Measure Implementation . <br /> Monitoring (:onlinuation Comments <br /> hydrants and nwler Responsibility: Landfill operator Responsibility:San Joaquin County <br /> ,ours, <br /> Dining: Water source shall be shown on Environnnental health I eparinnenl <br /> hnprovement Plan hinting: Prier to approval o/'improvement <br /> Plan <br /> 43 l.'or:vard 1993 (A.11) <br /> Balance ash control and Responsibility:Landfill operator Responsibility:San Joaquin County <br /> leachate generation Timing: Ongoing Environntenta!Health Department <br /> Timing: Daring ntonthli/Site llisits <br /> h. I IYDItOI.(X;Y AND WATER QUALITY <br /> 44 (1:.1) Drainage controls Responsibility: Landfill operator Responsibility: RW(1('It <br /> Timing: Letter from RWQCB shall be Timing: Prior to issuance of <br /> included with the improvement Plan Waste Discharl,e Requirements(WDlts) <br /> Channel recontig- Responsibility: Landfill operator Responsibility: RWQ('I1 <br /> uration and berms Timing: Letter from RWQCB shall be Timing: Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Replacement Responsibility:Landfill operator Responsibility: RWQCB <br /> floodplain Timing: Letter from RWQCB shall be Timing:Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Channel and Responsibility:Landfill operator Responsibility: RWQCB <br /> flooulhlain design 'Timing: Letter from RWQCB shall be Timing: Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> 45 (F.2) Structural erosion Responsibility: Landfill operator Responsibility: RWQCB <br /> controls Timing: Letter from RWQCB shall be Timing: Prior to issuance of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Operational erosion Responsibility: Landfill operator Responsibility:RWQCB <br /> cootiols 'Timing:Ongoing riming: Annually <br /> Rvvct ctntiou Responsibility: i.andfill operator Responsibility: RWO(•It <br /> Timing: Upon completion of cell 'I'in►ing: Ammally <br /> d4(V.3) Liner and leachate Responsibility: Landfill operator Itesponsibility: RW(1('Ii <br /> collection system 'Timing: Letter from RWQCB shall be Timing: Prior to issuance of <br /> L <br />