Laserfiche WebLink
('on~aolidated Forward Landfill Project-Mitigation Monitoring,acid Reporting Program (.'Ilcck)ist <br /> Page 36 <br /> Mitigation Measure ImplementationInlplenlentation <br /> Monitoring; Coll lirm:clion Comments <br /> design included with the Improvement Plan Waste Discharge Requirements(WDRs) — <br /> Separation between Responsibility:Landfill operator Responsibility: RWQCB <br /> liner and groundwater Timing: Letter from RWQCB shall be Timing: Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Leak detection system _ Responsibility:Landfill operator <br /> Timing: Letter from RWQCB shall be Timing: Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> ()perations layer Responsibility: Landfill operator <br /> ovet linrr � Rcsponsibilily: ItWQ('It <br /> 'Tinting!: I.eller trout MQCB.411811 Ito Tinning: Prior to approval ul' <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Double liner tinder Responsibility:Landfill operator Responsibility: RWQCB <br /> sulnp area Timing: Letter from RWQCB shall be Timing:Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Electric testing of Responsibility: Landfill operator <br /> Responsibility: RWQCB <br /> each WMU liner <br /> Timing: Prior to submission of Timing:Prior to approval of <br /> Construction Quality Control Assurance Construction Quality Control Assurance <br /> Report for each cell Report for each cell <br /> RWQCB required Responsibility:Landfill operator <br /> changes Timi :As re wired b W g Responsibility: RWQCB <br /> n <br /> g q y QC Timing:As required by RWQCB <br /> •17(F.,I) I:nl�incerinl., Icachate Responsibility: Landfill operator Responsibility: RWQ('11 <br /> cunU"h 'Tinting: Letter from RWQCB shall be Timing: Prior to approval of <br /> included with the Improvement Plan Waste Discharge Rcquicencc•nts(W I)Its) <br /> Leachate monitoring Responsibility: Landfill operator Responsibility: mQ(1,11, <br /> Timing: Daily Timing:Quarterly <br /> Leachate reporting/ Responsibility: Landfill operator <br /> Institutional controls •1'imin,: p Responsibility: ItWQC'11, D'I:S(' <br /> g, Quarterly Timing:Quarterly <br /> MQ('11:incl DISC Responsibility: Landfill operator Responsibility: RWQCB and/or DISC <br /> required changes Timing:As required <br /> Timing:As required <br />