Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation Monitoring and Reporting Program Checklist Parc,alt <br /> Inq►Ic•ucr•►►InUou <br /> �lilipc►Ilun 111cusurc' Ilist►IvnrvnIathm 111onUorlr►t: /'uullrn►allou d'unuueerls <br /> (Ali 1760) Timing: Prior to approval of Environmental Health Department <br /> Solid Waste Facilities Permit(SWFP) Timing: Prior it)Approval cf <br /> Solid►Yash•hac•ililics/'renin(SlllFP) <br /> 54 For►vnrrl 1993(C3) <br /> Sc c uudnr) r ontuirune►rt Responsibility:Landfill operator Responsibility:San Joaquin County <br /> Jirr diesel fire/ liming: Secondary containment shall be F.nviropimental Health Depru Inrrnt <br /> shown on/nrprovement Plan 77arinb: Drr►•inl;nu►nllrly site visits <br /> G. SOILS AND GEOLOGY <br /> 55 (G.2)Alternative daily cover Responsibility: Landfill operator Responsibility: CIWMB <br /> Timing: If and as needed Timing: If and as needed <br /> 56(G.3)Modify seismic design Responsibility: Landfill operator Responsibility: RWQCB and CIWMI3 <br /> if needed Letters from RWQCB and CIWMB Timing: Prior to issuance of <br /> approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan <br /> Monitor liner and Responsibility: Landfill operator Responsibility: RWQCB and CIWMB <br /> drainage system Timing: As determined by RWQCB Timing: Annually <br /> an(Vor CIWMB <br /> 57((i.4)Scisn►ic design Responsibility: Landfill operator Responsibility: ItWQ('ll and CIWMB <br /> requirements of 'Timing: Letters from RWQCB and CIWMB Timing: Prior to issuance of' <br /> Title 27 approving seismic design shall be Waste Discharge Requirements(WDRs) <br /> included with the Improvement Plan and Solid Waste Facilities Permit(SWFP) <br /> 58 (G.5)Implement erosion Responsibility:Landfill operator Responsibility: RWQCB <br /> management plan Timing:Daily Timing:Annually <br /> ReveP,clate conq►Irlc•d ReO <br /> sponsibility: Landfill operator Responsibility: ItWCH <br /> (.ells Timing: 111)(111 completion o1'Cacll cel) liming: Annually <br /> Frosiun controls on Responsibility: Landfill operator Responsibility: RWQ('Ii <br /> temporary slopes Timing:Upon construction of Timing:Annually <br /> temporary slopes <br /> Monitoring of erosion Responsibility: Landfill operator Responsibility: R WQcIt <br /> control measures 'Timing: Daily,and for at least 'liming:Annually, li)rat least <br />