My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2000-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2000-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 8:46:17 AM
Creation date
4/20/2021 10:34:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2000-2003
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Forward Landfill Project—Mitigation Monitoring;and Reporlirnl; Program Checklist Page 37" <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> '18 (1;.5) Design litr pre-loaded Responsibility: Landfill operator Responsibility: l(WOC11 and ClWM11 <br /> settlement 'Timing: Letter from RWQCB shall be 'Timing: Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Future design of Responsibility: Landfill operator Responsibility: RWQCB and CIWMB <br /> vertical expansion Timing: Prior to submission of Landfill Timing:Prior to approval of Landlill <br /> Design Plans for vertical expansion Design Plans for vertical expansion <br /> Maintain extraction Responsibility: Landfill operator Responsibility: RWQCB <br /> wells Timing:Ongoing Timing: Annually <br /> C1WMB and RWQCB Responsibility:Landfill operator Responsibility: RWQCB and CIWMB <br /> review vertical Timing: Prior to submission of Landfill Timing: Prior to approval of Landfill <br /> expansion design Design Plans for vertical expansion Design Plans for vertical expansion <br /> '19(F.6) Sample off-site wells Responsibility: Landfill operator Responsibility: RWQ('B <br /> to cast 'Timing:Quarterly(same frequency Timing: Quarterly(ssume frequency <br /> as onsite wells) as onsite wells) <br /> Sample additional Responsibility: Landfill operator Responsibility: RWQCB <br /> off-site wells Timing: At least twice a year Timing: At least twice a year <br /> Extract/treat VOCs Responsibility: Landfill operator Responsibility: RWQCB <br /> in offsite plume Timing:Ongoing Timing:Quarterly <br /> 50(F.7) Infiltration ol'treated Responsibility: Landfill operator Responsibility: RWQCB <br /> I;rouo�lwatrr 'fluting: Ongoing Tuning: Quarterly <br /> it (F.V) Replace groundwater Responsibility: Landfill operator Responsibility: RWQUB <br /> monitoring;wells Timing: As required by RWQCB 'Timing: As determined by RWQCB <br /> 5 ;I rcciin <br /> /994 (K3.c), Aihlin 2000(K3.e) <br /> Dining rel lischar pe of Responsibility:Landfill operator Re�spunsihililp: K11't)(7t <br /> detention pond Timing: Ongoing Timing: Annually <br /> 53 Austin 1994(K5.e),Austin 2000(K5.e) <br /> Salvage metallic discards Responsibility:Landfill operator Responsibility:San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.