Laserfiche WebLink
Consolidated Forward Landfill Project—Mitigation Monitoring;and Reporlirnl; Program Checklist Page 37" <br /> Implementation <br /> Mitigation Measure Implementation Monitoring Confirmation Comments <br /> '18 (1;.5) Design litr pre-loaded Responsibility: Landfill operator Responsibility: l(WOC11 and ClWM11 <br /> settlement 'Timing: Letter from RWQCB shall be 'Timing: Prior to approval of <br /> included with the Improvement Plan Waste Discharge Requirements(WDRs) <br /> Future design of Responsibility: Landfill operator Responsibility: RWQCB and CIWMB <br /> vertical expansion Timing: Prior to submission of Landfill Timing:Prior to approval of Landlill <br /> Design Plans for vertical expansion Design Plans for vertical expansion <br /> Maintain extraction Responsibility: Landfill operator Responsibility: RWQCB <br /> wells Timing:Ongoing Timing: Annually <br /> C1WMB and RWQCB Responsibility:Landfill operator Responsibility: RWQCB and CIWMB <br /> review vertical Timing: Prior to submission of Landfill Timing: Prior to approval of Landfill <br /> expansion design Design Plans for vertical expansion Design Plans for vertical expansion <br /> '19(F.6) Sample off-site wells Responsibility: Landfill operator Responsibility: RWQ('B <br /> to cast 'Timing:Quarterly(same frequency Timing: Quarterly(ssume frequency <br /> as onsite wells) as onsite wells) <br /> Sample additional Responsibility: Landfill operator Responsibility: RWQCB <br /> off-site wells Timing: At least twice a year Timing: At least twice a year <br /> Extract/treat VOCs Responsibility: Landfill operator Responsibility: RWQCB <br /> in offsite plume Timing:Ongoing Timing:Quarterly <br /> 50(F.7) Infiltration ol'treated Responsibility: Landfill operator Responsibility: RWQCB <br /> I;rouo�lwatrr 'fluting: Ongoing Tuning: Quarterly <br /> it (F.V) Replace groundwater Responsibility: Landfill operator Responsibility: RWQUB <br /> monitoring;wells Timing: As required by RWQCB 'Timing: As determined by RWQCB <br /> 5 ;I rcciin <br /> /994 (K3.c), Aihlin 2000(K3.e) <br /> Dining rel lischar pe of Responsibility:Landfill operator Re�spunsihililp: K11't)(7t <br /> detention pond Timing: Ongoing Timing: Annually <br /> 53 Austin 1994(K5.e),Austin 2000(K5.e) <br /> Salvage metallic discards Responsibility:Landfill operator Responsibility:San Joaquin County <br />