Laserfiche WebLink
4 <br /> equipment are removed from the sites, and boring locations in clean <br /> condition. <br /> B. Surplus Backfill Materials: Transport and place surplus backfill materials in <br /> stockpiles or place in areas as directed by the Engineer. <br /> PART 4— MEASUREMENT AND PAYMENT <br /> 4.01 MOBILIZATION/ DEMOBILIZATION <br /> Measurement— <br /> Measurement for Mobilization/Demobilization shall be in accordance with section <br /> 1.05. <br /> Payment <br /> Payment for mobilization/demobilization will be based on the lump sump price <br /> quoted in the bid proposal. Payment shall be full compensation for labor, <br /> materials, tools, equipment overhead, and other work necessary to complete the <br /> work of this section. Unless authorized in writing by the Engineer, the quantity <br /> paid shall not exceed the amount shown on the proposal. <br /> 4.02 TRIPLE PROBE SOIL GAS WELL <br /> Measurement <br /> Measurement for installing soil gas wells shall be by the linear foot. Contractor <br /> shall measure the depth from ground surface to the bottom of each well completed <br /> with a weighted tape in the presence of the Engineer. <br /> Payment <br /> Payment for each soil gas wells shall be by the unit price per linear foot quoted, in <br /> the bid proposal. The unit price quoted shall include full compensation for <br /> furnishing all labor, materials, tools, equipment, and incidentals, and for doing all <br /> the work involved in installing the triple probe soil gas monitoring well completely <br /> as shown on the Construction Drawings and specified herein. <br /> 4.03 WELL ENCLOSURE <br /> Measurement <br /> Soil Gas Monitoring Well Specs San Joaquin County-Public Works <br /> Foothill Sanitary Landfill& 11 Solid Waste Division <br /> Corral Hollow Sanitary Landfill Printed 10/10/2007 <br />