Laserfiche WebLink
6 0 Page 1 of 1 <br />Natalia Subbotnikova [EH] <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Wednesday, November 14, 2007 9:50 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Michael Carroll; Robert McClellon [EH]; Jaime Perez <br />Subject: GW Well Installation At Corral Hollow <br />Importance: High <br />Hello Natalia <br />We have scheduled work for the installation of 2 ground water monitoring wells (MW -8 and MW -9) at corral <br />Hollow Landfill on Monday, November 26 th. Installation of the new ground water wells as specified in <br />the work plan will also involve drilling temporary borings to find the shallow aquifer. <br />The driller, Gregg Drilling Inc will be on site at 8.00am. Work schedule is 8.00am to 5.00pm. <br />Completion of the wells is expected to take 4-5 days. Kleinfelder Inc will be our consultant doing the logging of <br />the wells. <br />Please let me know if you need any additional information <br />Thanks <br />Joyesh J Chandra <br />San Joaquin County <br />Department Of Public Works <br />Solid Waste Division <br />PH -(209) 468-3066 <br />FAX -(209)468-3078 <br />i cllandra(a�sjgov.org <br />11/14/2007 <br />