My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2007 (7/07 - 12/07)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2007 (7/07 - 12/07)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:38:31 PM
Creation date
4/20/2021 12:09:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2007 (7/07 - 12/07)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N 0 9 Page 1 of 2 <br />Natalia Subbotnikova [EH] <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Tuesday, November 20, 20071:32PM <br />To: Natalia Subbotnikova [EH] <br />Cc: Michael Carnz|;nruud@gneoodrUUno.00m <br />Subject: RE: GW Well Installation At Corral Hollow <br />The work on 26th November will involve just installing 2 permanent ground water wells onl <br />The work involves drilling exploratory borings to determine the westerly extent of the shallo <br />aquifer and then installing two groundwater wells. i <br />The scheduled work does not involve work installing soil gas monitoring well GW -1A. The <br />installation of GW -1A is a separate project which will take place after the installations of the <br />soil gas monitoring wells at Foothill Landfill. <br />Since we will be drilling exploratory borings to find the shallow aquifer, we may encounter <br />different issues in the field, thus inspection time specified may change. <br />The first work location we will start will be on the North West end of the landfill i.e. close to <br />Corral Hollow Rd. After we have completed work there, we will then move to the South <br />western end of the landfill (By Corral Hollow Creek) <br />We would like to grout the temporary borings the same day to avoid any caving of the borings. <br />The borings that we will determine suitable for establishing our permanent ground water well <br />will be established the next day but covered with plywood and sealed as described in our work <br />The driller has informed me that they should be ready for inspection around 2.30pm to grout <br />temoorary borings on Monday Nov 26th. The driller will notify you on site the approximate time <br />they would be ready for inspection to establish the ground water well the next day. <br />Tt�e —same work procedure and inspection scfte—d–u Fin—gwilf be applied to locate IT.11'1-g aF0 <br />inspection time will be notified to you on site. I <br />JoNresh JCbaod[o <br />San Joaquin County <br />Department (l[Public Works <br />Solid Waste Division <br />PH -(209) 468-3066 <br />Pf\}{-(209)460-3070 <br />Original <br />Fromm: NataUaSubbotnihova [EH] [nlaUtomaubbotniknva@sjcehd.con] <br />Sent: Tuesday, November 2D,2OU78:5OAM <br />To: ]oveshChandra; Nata|iaSubbotnikova [EH] <br />Cc: Michael Kith [EH] <br />Subject: RE: GW Well Installation At Corral Hollow <br />]l/20/20A7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.