Laserfiche WebLink
0 0 Page 2 of 2 <br />Hi Joyesh, <br />Just to remind you that you should not install any wells without EHD presence. <br />Please, give me exact time when you will need me at the Corral Hollow on Monday, November 26th <br />Thanks, <br />Natalia Subbotnikova, R.E.H.S <br />San Joaquin County Environmental Health Department <br />600 E Main St <br />Stockton, CA 95202 <br />(209) 468-0338 <br />From: Joyesh Chandra [mailto:Jchandra@sjgov.org] <br />Sent: Wednesday, November 14, 2007 9:50 AM <br />To: Natalia Subbotnikova [EH] <br />Cc: Michael Carroll; Robert McClellon [EH]; Jaime Perez <br />Subject: GW Well Installation At Corral Hollow <br />Importance: High <br />Hello Natalia <br />We have scheduled work for the installation of 2 ground water monitoring wells (MW -8 and MW - <br />9) at corral Hollow Landfill on Monday, November 26th. Installation of the new <br />ground water wells as specified in the work plan will also involve drilling temporary borings to find <br />the shallow aquifer. <br />The driller, Gregg Drilling Inc will be on site at 8.00am. Work schedule is 8.00am to 5.00pm. <br />Completion of the wells is expected to take 4-5 days. Kleinfelder Inc will be our consultant doing <br />the logging of the wells. <br />Please let me know if you need any additional information <br />Thanks <br />Joyesh J Chandra <br />San Joaquin County <br />Department Of Public Works <br />Solid Waste Division <br />PH -(209) 468-3066 <br />FAX -(209)468-3078 <br />jchandr4@$ig_ov org <br />11/20/2007 <br />