My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A) Plan Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> 2.4.1 Observation of Non-Conformance ...............................................11 <br /> 2.4.2 Determining Extent of Non-Conformance ..................................11 <br /> 2.4.3 Documenting Non-Conformance .................................................12 <br /> 2.4.4 Corrective Measures ....................................................................12 <br /> 2.4.5 Verification of Corrective Measures............................................12 <br /> 2.5 Construction Monitoring........................................................................13 <br /> 2.5.1 Monitoring Priorities ...................................................................13 <br /> 2.5.2 Discrepancies ...............................................................................13 <br /> 2.6 Materials Quality Verification...............................................................13 <br /> 2.6.1 General.........................................................................................13 <br /> 2.6.2 Material Submittals.....................................................................13 <br /> 2.6.3 Certificates of Compliance and Conformance.............................14 <br /> 3.0 CONSTRUCTION QUALITY ASSURANCE FOR EARTHWORK..........15 <br /> 3.1 Introduction ............................................................................................15 <br /> 3.2 Earthwork Construction Testing...........................................................15 <br /> 3.2.1 Test Standards.............................................................................15 <br /> 3.2.2 Test Frequencies..........................................................................16 <br /> 3.2.3 Soil Sample Numbering...............................................................16 <br /> 3.2.4 Soil Sample Tagging....................................................................17 <br /> 3.2.5 Soil Sample Processing................................................................18 <br /> 3.3 Field Density Tests.................................................................................18 <br /> 3.3.1 Test Numbering...........................................................................18 <br /> 3.3.2 Test Locations ..............................................................................18 <br /> 3.4 Monitoring and Testing Requirements..................................................19 <br /> 3.4.1 Clearing and Stripping................................................................19 <br /> 3.4.2 Engineered Fill.............................................................................19 <br /> 3.4.3 Liner Subgrade Preparation........................................................19 <br /> 3.4.4 Vegetative Layer..........................................................................20 <br /> 4.0 CONSTRUCTION QUALITY ASSURANCE FOR GEOSYNTHETICS..21 <br /> 4.1 General....................................................................................................21 <br /> Vector Engineering, Inc. • 143E Spring Hill Drive*Grass Valley, CA• (530)272-2448 <br /> -ii- <br />
The URL can be used to link to this page
Your browser does not support the video tag.