My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2008 (7/08 TO 12/08)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2008 (7/08 TO 12/08)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:39:24 PM
Creation date
4/20/2021 1:14:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2008 (7/08 TO 12/08)
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Quality Assurance A) Plan Is Extension of Closure Cap <br /> Corral Hollow Sanitary Landfill August 21,2008 <br /> 4.2 Y <br /> Geos nthetic Clay Liner.........................................................................21 <br /> Y <br /> 4.2.1 Manufacturing .............................................................................21 <br /> 4.2.2 Labeling........................................................................................22 <br /> 4.2.3 Shipment and Storage .................................................................22 <br /> 4.2.4 Conformance Testing...................................................................23 <br /> 4.2.5 Surface Preparation.....................................................................24 <br /> 4.2.6 Repair...........................................................................................24 <br /> 4.2.7 Materials in Contact with GCL...................................................25 <br /> 5.0 DOCUMENTATION........................................................................................26 <br /> 5.1 Daily Record Keeping.............................................................................26 <br /> 5.1.1 Daily Record of Construction Progress .......................................26 <br /> 5.1.2 Observation and Test Data Sheets .............................................27 <br /> 5.1.3 Non-Conformance Reports...........................................................27 <br /> 5.2 Weekly Progress Reports........................................................................27 <br /> 5.3 Photographs............................................................................................28 <br /> 5.4 Design and Specification Changes.........................................................28 <br /> 5.5 Final Construction Report......................................................................28 <br /> LIST OF TABLES <br /> Table 3-1 g re Engineered Fill Construction Testing Frequencies <br /> g q <br /> Table 3-2 Vegetative Soil Cover Layer Construction Testing Frequencies <br /> Vector Engineering, Inc. • 143E Spring Hill Drive•Grass Valley, CA• (530 272-2448 <br /> p 9 Y ) <br /> -iii- <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.