My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2007-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 10:18:09 AM
Creation date
4/20/2021 1:45:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2013
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br />California Integrated Waste <br />CIWMB 03 (Rev. 4/04) Management Board <br />INSPECTION REPORT ADDENDUM PAGE 2 OF 4 <br />AGENCY CONDUCTING INSPECTION: San Joaquin County Environmental Health Department <br />SITE NUMBER: 39 -AA -0015 <br />SITE NAME: <br />Forward Inc. <br />INSPECTOR: Robert McClellon <br />RECEIVED BY <br />INSPECTION DATE: 01/16/09 OPERATOR <br />COMMENTS: <br />1. Violation T27CCR 20921 (a) 2 — Explosive Gas Control — The facility has explosive gas at the boundary above 5% by <br />volume. The following perimeter gas wells were monitored. The following results were noted. <br />GP 9 (S) 0.0% CH4 GP 11 (S) 13.2% CH4 GP 12 (S) 1.1% CH4 <br />(I) 0.0% CH4 (I) 23.9% CH4 (1) 3.2% CH4 <br />(D) 0.0% CH4 (D) 0.0% CH4 (D) 0.0% CH4 <br />The facility operator needs to take the necessary steps to control the landfill gas at the boundary. Any changes or <br />modifications to the gas extraction system must have prior approval from the SJVAPCD and the EHD. Review the <br />gas system operations records to determine if the gas levels are due to a line blockage or gas well field adjustment is <br />required. Review the Operations and Maintenance (O&M) manual to determine if all the required maintenance was <br />conducted. Evaluate the O&M manual to determine if maintenance in adequate. <br />2. AC T27CCR 20921 (b) — Gas Monitoring and Control — The operator submitted a report titled "Title 27 Compliance <br />Review, Perimeter Probe Monitoring Network, Forward Landfill' on September 16, 2008. The initial plan was <br />reviewed by the EHD. The EHD requested more information regarding surrounding land uses and structures located <br />near the landfill. The operator responded on December 12, 2008. The EHD reviewed the additional information <br />submitted and conducted a field investigation regarding the actual spacing of Gas probe distances. The following <br />was noted: <br />• GP is 1000ft from GP25 <br />• GP24 is 101 Oft from GP25 <br />• GP 16 is 1008ft from GP 17 <br />• GP3 is 998.5ft from GP4 <br />The plan is pending final review and comment from the EHD. <br />3. AC T27CCR 20939 (b) (1) — Sub -surface Landfill Gas Control Systems — The facility has experienced 5 subsurface <br />landfill fires. Four of the fires occurred in this year. The fires are all located along the toe of the slope. The latest fire <br />occurred a long the western toe of the old Forward Inc portion of the landfill. The fire occurred along the horizontal <br />collector. The facility operator indicated that they would place soil over the area and monitor it. The operator <br />provided a copy of the facility response plan the pertained to sub -surface landfill fires. It is currently under review. It <br />appears that the landfill gas system is over pulling and creating fires that erupt below the surface of the landfill. The <br />facility shall review and evaluate the gas control system to determine what can be done to prevent further instances <br />of sub -surface landfill fires. The review and analysis of the gas extraction system shall be completed by January 30, <br />2009. <br />INSPECTOR SIGNATURE: DATE:///to /0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.