Laserfiche WebLink
Ash, Page I of 2 <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra [Jchandra@sjgov.org] <br /> Sent: Wednesday, February 15, 2012 9:32 AM <br /> To: Natalia Subbotnikova [EH] <br /> Cc: Michael Carroll;jmhower@geo-logic.com; Moe Ruud <br /> Subject: RE: Corral Hollow-EMP Phase 2-Schedule <br /> Hello Natalia <br /> I am confirming the well drilling schedule for the EMP project as emailed to you before. The <br /> driller will be ready to install the temporary well casing of the first well at approximately 10:30 <br /> am on Feb 211t. We request EHD's inspection at this time. Other consecutive inspections of <br /> the temporary well casing will be coordinated with you in the field. <br /> If you have any questions, please give me a call. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> PH: (209) 468-3066 <br /> Fax: (209) 468-3078 <br /> From: Joyesh Chandra <br /> Sent: Monday, January 30, 2012 9:08 AM <br /> To: 'Natalia Subbotnikova [EH]' <br /> Cc: Michael Carroll <br /> Subject: Corral Hollow-EMP Phase 2-Schedule <br /> Hello Natalia <br /> We have tentatively scheduled the phase 2 investigation work of the Evaluation Monitoring <br /> Program (EMP) work near our Corral Hollow Landfill in reference to the EMP work plan <br /> Revision No 2. This work schedule is depended on the encroachment permit approval from <br /> Caltrans and weather conditions. <br /> We request EHD to make a note of the project's tentative schedule. As required by the drilling <br /> permit general guidelines, we will confirm the work schedule five working days before starting <br /> the project. The driller has been notified about EHD's inspection time from 9:00am to 3:30 <br /> pm. <br /> TENTATIVE PROJECT SCHEDULE <br /> 1. Drilling of three (3) borings and installation of temporary groundwater (GW) wells: <br /> 2/16/2012 <br />