Laserfiche WebLink
Page 2 of 2 <br /> February 21St to 24th <br /> A. EHD will be notified for inspection of the temporary wells. <br /> 2. Groundwater sample lab analysis (Approximately 2 weeks) <br /> 3. Well completion or well abandonment (Based on the results of the GW samples): March <br /> 12th to 16th <br /> A. EHD will be provided an estimated time for well completion or well abandonment <br /> inspection. <br /> B. EHD will be notified of other consecutive inspections after the first inspection in <br /> the field. <br /> Let me know if you need any additional information. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> 1810 E. HAZELTON AVE <br /> STOCKTON, CA 95201 <br /> PH: (209) 468-3066 <br /> FAX: (209) 468-3078 <br /> Email:jchandra@sjgov.org <br /> 2/16/2012 <br />