My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:13 PM
Creation date
4/21/2021 2:55:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
diameter O.D. PVC pipes; at HLSL and CHSL, the PVC pipes are Y2" <br /> diameter O.D. Also at FHSL and NCRCSL, there are also several older <br /> style soil gas wells that have perforated tubes installed within the PVC pipe. <br /> For these older style wells, the only work to be done involves installation of <br /> a labcock valve inplace of the as built plastic cap. <br /> 3.0 CONSTRUCTION <br /> 3.1 SCHEDULE <br /> SWD will schedule installation of the GW monitoring wells after approval of <br /> work plan. SWD anticipitates to begin the tube installation project by <br /> beginning of April 2012. The project may involve eight (8) working days <br /> with a work schedule of Monday to Friday 9:00 am to 4.00 pm. <br /> 4.0 HEALTH AND SAFETY PLAN <br /> 4.1 RESPONSIBILITY FOR SAFETY <br /> County staff will be conducting all work done during this project. The staff <br /> involved is familiar with and follows county safety practices. <br /> 4.2 WORK SITE SAFETY <br /> The installation of the new PE tubes within existing PVC pipes inside of the <br /> SIG monitoring wells does not include excavation of refuse or contact with <br /> refuse. <br /> 4.3 SAFETY PROCEDURES <br /> A safety meeting will be held on the first day of the project to discuss all <br /> safety issues. The following safety practices will be followed during the <br /> project. <br /> 1. Hard hats, safety glasses and safety vests will be required for personnel <br /> who are working near the construction area and operating heavy <br /> equipment. <br /> Work Plan-Groundwater Monitoring Well Installation San Joaquin County <br /> March 28,2012 Department Of Public Works <br /> Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.