Laserfiche WebLink
A ; Page 1 of 2 <br /> s <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra [Jchandra@sjgov.org] <br /> Sent: Tuesday, December 18, 2012 11:25 AM <br /> To: Robert McClellon [EH] <br /> Cc: Natalia Subbotnikova [EH]; Michael Carroll; Gino.Yekta@CalRecycle.ca.gov; <br /> michael.wochnick@CalRecycle.ca.gov <br /> Subject: RE: Corral Hollow Landfill. Comments on revised design for landfill cover extension. <br /> Importance: High <br /> Hello Robert <br /> Thanks for your email regarding Corral Hollow's Closure plan addendum Revision No 2 <br /> submitted to EHD for review on November 1, 2012. We think we have the issues well <br /> covered, but let us know if you need anything more. <br /> 1. Refuse and Burn Ash as Cover <br /> We addressed the concern for reusing soil mixed with refuse or burn ash in the <br /> Closure Plan Addendum Rev No 2. Please see In Appendix 1 "Technical <br /> Specification" of the Closure Plan, Section 02200 page 9 Section 3.08 5 and <br /> Section 3.14 C. We tell the contractor what to do with refuse and burn ash when <br /> excavated, but it cannot be used as cover. <br /> Excavated material will only be used for Earthfill or Vegetative cover if it meets <br /> suitability requirements per 02200 1.05 2D. If the excavated material is not <br /> suitable, then the Earthfill and Vegetative layer soil will be excavated from the on- <br /> site soil retention pond (Section 02200 Page 5 and 6). <br /> 2. Health and Safety Plan <br /> The Health and Safety Plan (HS&P) was not included in our submittal because <br /> this is one of the items that the Contractor is required to supply after the award of <br /> Contract. The Contractor will submit a H&SP for the project 30 days prior to start <br /> of construction. <br /> To ensure that all important items are covered in the H&SP, does EHD have a <br /> guideline that Solid Waste Division could provide to the Contractor to follow when <br /> preparing the H&SP? The guideline will eliminate any confusion and speed up <br /> preparation and approval of the H&SP. <br /> 3. Phone Number for EHD <br /> The phone number for EHD's inspection was corrected on Technical Specs <br /> Section 02776-4 3.01 "Permits and Inspection". <br /> Best regards, <br /> JOYESH CHANDRA <br /> 12/18/2012 <br />