Laserfiche WebLink
Page 1 of 1 <br />SubbotnikovaNatalia <br />From: Robert McClellon [EH] <br />Sent: Tuesday, May 28, 2013 8:45 AM <br />To: 'Michael Carroll' <br />Cc: Joyesh Chandra; Moe Rudd (mruud@greggdrilling.com); Isham, Julian; Natalia Subbotnikova [EH] <br />Subject: RE: Bore diameter for groundwater wells <br />Mike the EHD is okay with 10 inch bore diameter. Robert <br />Robert McClellon, Program Coordinator REHS <br />Environmental Health Department <br />1868 E. Hazelton Ave <br />Stockton, CA 95205-6232 <br />Phone (209) 468-0332 <br />Fax (209) 468-8392 <br />From: Michael Carroll [mailto:mcarroll@sjgov.org] <br />Sent: Friday, May 24, 2013 4:20 PM <br />To: Robert McClellon [EH] <br />Cc: Joyesh Chandra; Moe Rudd (mruud@greggdrilling.com); Isham, Julian; Natalia Subbotnikova [EH] <br />Subject: Bore diameter for groundwater wells <br />Good afternoon Robert, <br />This is to confirm Natalia's verbal approval of the 10 -inch bore diameter for the new groundwater <br />monitoring wells. <br />Have a great holiday. <br />Mike <br />W. Michael Carroll, PE <br />Senior Civil Engineer, Public Works/Solid Waste <br />Phone (Direct): 209-468-8504 <br />5/28/2013 <br />