Laserfiche WebLink
*N Page 2 of 3 <br />From: Robert McClellon [EH] [ma ilto: RMcClel Ion @sjcehd.com] <br />Sent: Tuesday, May 28, 2013 8:36 AM <br />To: Michael Carroll <br />Cc: Joyesh Chandra; Jayna Rutz; Schneider, Eric A; Natalia Subbotnikova [EH] <br />Subject: RE: Handling ash -containing soil at Corral Hollow <br />Mike, please keep in mind that you already have information that indicates that the ash laden soil may be <br />hazardous. With that said it is important that you get all the sampling completed so that if the ash laden soil <br />is hazardous it is not onsite longer than 90 days from the accumulation start date. If it comes back non haz <br />then time frames are not applicable. When you do the sampling for the stock pile you will need to change <br />your sampling criteria. Your last results included a fish bio assay. That is not required for metals (generally <br />speaking). If you need guidance on this let me know. Robert <br />Robert McClellon, Program Coordinator REHS <br />Environmental Health Department <br />1868 E. Hazelton Ave <br />Stockton, CA 95205-6232 <br />Phone (209) 468-0332 <br />Fax (209) 468-8392 <br />From: Michael Carroll [mailto:mcarroll@sigov.o[g] <br />Sent: Friday, May 24, 2013 2:20 PM <br />To: Robert McClellon [EH] <br />Cc: Joyesh Chandra; Jayna Rutz; Schneider, Eric A <br />Subject: Handling ash -containing soil at Corral Hollow <br />Hello Robert, <br />As you know, our plan was that PSC truck drivers locate their bins on a truck to receive ash - <br />containing soil, driving off when the bin was full. Our arrangement with PSC was for Wednesday <br />and Thursday, based on our estimate of the amount of ash -containing soil that needed to be <br />removed. <br />However, we found that more ash -laden soil needed to be removed than we anticipated. Because <br />PSC could not provide a driver for today (Friday), and because R1 needs to proceed with the work, <br />we will ask R1 Gordon to stockpile any ash-contining soil they remove today over by the flare <br />station. <br />PSC can provide a driver on Tuesday (first work day of that week), and normal removal practices <br />will resume. THE stockpiled material will be removed from the site along with the other ash - <br />containing soil at the earliest opportunity. <br />Please call with any questions. <br />Best regards, <br />Mike <br />W. Michael Carroll, PE <br />5/30/2013 <br />